Knowledge sharing in a fragmented construction industry: On the hindsight AM Alashwal, HA Rahman, AM Beksin Scientific Research and Essays 6 (7), 1530-1536, 2011 | 93 | 2011 |
Empirical study to determine fragmentation of construction projects AM Alashwal, PSW Fong Journal of Construction Engineering and Management 141 (7), 04015016, 2015 | 54 | 2015 |
Game analysis on prefabricated building evolution based on dynamic revenue risks in China X Li, C Wang, A Alashwal, S Bora Journal of Cleaner Production 267, 121730, 2020 | 51 | 2020 |
Literature mapping: A bird’s eye view on classification of factors influencing project success AA Abdullah, HA Rahman, Z Harun, AM Alashwal, AM Beksin African Journal of Business Management 4 (19), 4174-4182, 2010 | 51 | 2010 |
Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group AA Hijazi, S Perera, RN Calheiros, A Alashwal Journal of construction engineering and management 147 (10), 03121005, 2021 | 50 | 2021 |
Determining the relationship between conflict factors and performance of international construction projects E Zouher Al-Sibaie, A Mohammed Alashwal, H Abdul-Rahman, ... Engineering, Construction and Architectural Management 21 (4), 369-382, 2014 | 49 | 2014 |
Determining success criteria and success factors for international construction projects for Malaysian contractors AM Alashwal, NF Fareed, KM Al-Obaidi Construction Economics and Building 17 (2), 62-80, 2017 | 47 | 2017 |
Exploring the barriers for implementing waste trading practices in the construction industry in Australia S Ratnasabapathy, A Alashwal, S Perera Built Environment Project and Asset Management 11 (4), 559-576, 2021 | 34 | 2021 |
Blockchain adoption in construction supply chain: A review of studies across multiple sectors AA Hijazi, S Perera, A Alashwal, RN Calheiros CIB World Building Congress, Hong Kong 2021, 2019 | 34 | 2019 |
Investigation of waste diversion rates in the construction and demolition sector in Australia S Ratnasabapathy, A Alashwal, S Perera Built Environment Project and Asset Management 11 (3), 427-439, 2021 | 32 | 2021 |
Abandoned housing projects in Malaysia: Pressing issues during the rehabilitation process HA Rahman, AM Alashwal, M Ayub, AA Abdullah ArchNet-IJAR: International Journal of Architectural Research 7 (1), 65, 2013 | 32 | 2013 |
Simulation techniques for cost management and performance in construction projects in Malaysia AM Alashwal, MY Chew Built Environment Project and Asset Management 7 (5), 534-545, 2017 | 24 | 2017 |
Using PLS-PM to model the process of inter-project learning in construction projects AM Alashwal, H Abdul-Rahman Automation in Construction 44, 176-182, 2014 | 24 | 2014 |
Knowledge utilization process in highway construction projects AM Alashwal, H Abdul-Rahman, J Radzi Journal of Management in Engineering 32 (4), 05016006, 2016 | 22 | 2016 |
Case study on BIM and value engineering integration for construction cost control X Li, C Wang, A Alashwal Advances in Civil Engineering 2021, 1-13, 2021 | 21 | 2021 |
Weather and labor productivity in construction: a literature review and taxonomy of studies AM Al Refaie, AM Alashwal, Z Abdul-Samad, H Salleh International Journal of Productivity and Performance Management 70 (4), 941-957, 2021 | 20 | 2021 |
A review of smart technology usage in construction and demolition waste management S Ratnasabapathy, S Perera, A Alashwal | 20 | 2019 |
Enabling a single source of truth through BIM and blockchain integration AA Hijazi, S Perera, AM Al-Ashwal, R Neves Calheiros Proceedings of the 2019 International Conference on Innovation, Technology …, 2019 | 19 | 2019 |
Risk factors in construction projects during unrest period in Yemen AM Al-Ashwal, MH Al-Sabahi Journal of Construction in Developing Countries, 43-62, 2018 | 19 | 2018 |
Influence of organizational learning and firm size on risk management maturity AM Alashwal, H Abdul-Rahman, A Asef Journal of management in engineering 33 (6), 04017034, 2017 | 17 | 2017 |