Follow
Ali Alashwal
Ali Alashwal
School of Engineering, Design and Built Environment, Western Sydeny University
Verified email at westernsydney.edu.au
Title
Cited by
Cited by
Year
Knowledge sharing in a fragmented construction industry: On the hindsight
AM Alashwal, HA Rahman, AM Beksin
Scientific Research and Essays 6 (7), 1530-1536, 2011
932011
Empirical study to determine fragmentation of construction projects
AM Alashwal, PSW Fong
Journal of Construction Engineering and Management 141 (7), 04015016, 2015
542015
Game analysis on prefabricated building evolution based on dynamic revenue risks in China
X Li, C Wang, A Alashwal, S Bora
Journal of Cleaner Production 267, 121730, 2020
512020
Literature mapping: A bird’s eye view on classification of factors influencing project success
AA Abdullah, HA Rahman, Z Harun, AM Alashwal, AM Beksin
African Journal of Business Management 4 (19), 4174-4182, 2010
512010
Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group
AA Hijazi, S Perera, RN Calheiros, A Alashwal
Journal of construction engineering and management 147 (10), 03121005, 2021
502021
Determining the relationship between conflict factors and performance of international construction projects
E Zouher Al-Sibaie, A Mohammed Alashwal, H Abdul-Rahman, ...
Engineering, Construction and Architectural Management 21 (4), 369-382, 2014
492014
Determining success criteria and success factors for international construction projects for Malaysian contractors
AM Alashwal, NF Fareed, KM Al-Obaidi
Construction Economics and Building 17 (2), 62-80, 2017
472017
Exploring the barriers for implementing waste trading practices in the construction industry in Australia
S Ratnasabapathy, A Alashwal, S Perera
Built Environment Project and Asset Management 11 (4), 559-576, 2021
342021
Blockchain adoption in construction supply chain: A review of studies across multiple sectors
AA Hijazi, S Perera, A Alashwal, RN Calheiros
CIB World Building Congress, Hong Kong 2021, 2019
342019
Investigation of waste diversion rates in the construction and demolition sector in Australia
S Ratnasabapathy, A Alashwal, S Perera
Built Environment Project and Asset Management 11 (3), 427-439, 2021
322021
Abandoned housing projects in Malaysia: Pressing issues during the rehabilitation process
HA Rahman, AM Alashwal, M Ayub, AA Abdullah
ArchNet-IJAR: International Journal of Architectural Research 7 (1), 65, 2013
322013
Simulation techniques for cost management and performance in construction projects in Malaysia
AM Alashwal, MY Chew
Built Environment Project and Asset Management 7 (5), 534-545, 2017
242017
Using PLS-PM to model the process of inter-project learning in construction projects
AM Alashwal, H Abdul-Rahman
Automation in Construction 44, 176-182, 2014
242014
Knowledge utilization process in highway construction projects
AM Alashwal, H Abdul-Rahman, J Radzi
Journal of Management in Engineering 32 (4), 05016006, 2016
222016
Case study on BIM and value engineering integration for construction cost control
X Li, C Wang, A Alashwal
Advances in Civil Engineering 2021, 1-13, 2021
212021
Weather and labor productivity in construction: a literature review and taxonomy of studies
AM Al Refaie, AM Alashwal, Z Abdul-Samad, H Salleh
International Journal of Productivity and Performance Management 70 (4), 941-957, 2021
202021
A review of smart technology usage in construction and demolition waste management
S Ratnasabapathy, S Perera, A Alashwal
202019
Enabling a single source of truth through BIM and blockchain integration
AA Hijazi, S Perera, AM Al-Ashwal, R Neves Calheiros
Proceedings of the 2019 International Conference on Innovation, Technology …, 2019
192019
Risk factors in construction projects during unrest period in Yemen
AM Al-Ashwal, MH Al-Sabahi
Journal of Construction in Developing Countries, 43-62, 2018
192018
Influence of organizational learning and firm size on risk management maturity
AM Alashwal, H Abdul-Rahman, A Asef
Journal of management in engineering 33 (6), 04017034, 2017
172017
The system can't perform the operation now. Try again later.
Articles 1–20