Follow
Kazem Oraee
Kazem Oraee
Professor of Technological Economics, Stirling University
Verified email at stir.ac.uk - Homepage
Title
Cited by
Cited by
Year
Studying the stress redistribution around the longwall mining panel using passive seismic velocity tomography and geostatistical estimation
N Hosseini, K Oraee, K Shahriar, K Goshtasbi
Arabian Journal of Geosciences 6, 1407-1416, 2013
832013
Transition from open-pit to underground as a new optimization challenge in mining engineering
E Bakhtavar, K Shahriar, K Oraee
Journal of Mining Science 45, 485-494, 2009
722009
Passive seismic velocity tomography on longwall mining panel based on simultaneous iterative reconstructive technique (SIRT)
N Hosseini, K Oraee, K Shahriar, K Goshtasbi
Journal of Central South University 19, 2297-2306, 2012
442012
Fuzzy model for truck allocation in surface mines
K Oraee, B Asi
Mine Planning and Equipment Selection 2004, Thirteenth International …, 2004
372004
A model for determining optimal transition depth over from open-pit to underground mining
E Bakhtavar, K Shahriar, K Oraee
Proceedings of the 5th International Conference on Mass Mining, 393-400, 2008
362008
Effect of discontinuities characteristics on coal mine stability and sustainability: A rock fall prediction approach
K Oraee, N Oraee, A Goodarzi, P Khajehpour
International journal of mining science and technology 26 (1), 65-70, 2016
352016
Prediction of the penetration rate of TBM using adaptive neuro fuzzy inference system (ANFIS)
K Oraee, MT Khorami, N Hosseini
Proceeding of SME annual meeting and exhibit, 297-302, 2012
282012
Passive seismic velocity tomography and geostatistical simulation on longwall mining panel
N Hosseini, K Oraee, K Shahriar, K Goshtasbi
Archives of mining sciences 57 (1), 139--155, 2012
252012
Mining method selection and optimization of transition from open pit to underground in combined mining
E Bakhtavar, K Shahriar, K Oraee
Journal of Archives of Mining Sciences 54 (3), 481-493, 2009
252009
Determination of the optimum crown pillar thickness between open pit and block caving
E Bakhtavar, K Oraee, K Shahriar
29th international conference on ground control in mining, 325-332, 2010
212010
Considering environmental costs of copper production in cut-off grades optimization
E Rahimi, K Oraee, Z Aldin Shafahi Tonkaboni, H Ghasemzadeh
Arabian Journal of Geosciences 8, 7109-7123, 2015
202015
An approach towards ascertaining open-pit to underground transition depth
K Oraee, E Bakhtavar, K Shahriar
Journal of Applied Sciences 8 (23), 4445-4449, 2008
202008
Seismic analysis of horseshoe tunnels under dynamic loads due to earthquakes
K Oraee, N Hosseini, M Gholinejad
10th Underground Coal Operators' Conference 2010, 140-145, 2010
19*2010
Prediction of rock fragmentation in open pit mines, using neural network analysis
K Oraee, B Asi
Fifteenth international symposium on mine planning and equipment selection …, 2006
182006
Evaluating underground mining hazards by fuzzy FMEA
K Oraee, A Yazdani-Chamzini, MH Basiri
2011 SME Annual Meeting & Exhibit and CMA 113th National Western Mining …, 2011
172011
Assessing prediction models of advance rate in tunnel boring machines—a case study in Iran
K Oraee, B Salehi
Arabian Journal of Geosciences 6, 481-489, 2013
162013
A model for determining the breaking characteristics of immediate roof in longwall mines
A Noroozi, K Oraee, M Javadi, K Goshtasbi, H Khodadady
Yerbilimleri 33 (2), 193-203, 2012
162012
General approach to distribute waste rocks between dump sites in open cast mines
K Oraee, A Goodarzi
Sixteenth international symposium on mine planning and equipment selection …, 2007
162007
Analysis of availability and utilization of dragline for enhancement of productivity in surface mines-a case study
M Mohammadi, P Rai, K Oraee, M Kumar
Proceedings of the 23rd World Mining Congress, Montreal, 55-78, 2013
142013
A new approach for determination of tunnel supporting system using analytical hierarchy process (AHP)
K Oraee, N Hosseini, M Gholinejad
9th Underground Coal Operators' Conference (Coal 2009: Coal Operators …, 2009
142009
The system can't perform the operation now. Try again later.
Articles 1–20