Real-time information capturing and integration framework of the internet of manufacturing things Y Zhang, G Zhang, J Wang, S Sun, S Si, T Yang International Journal of Computer Integrated Manufacturing 28 (8), 811-822, 2015 | 275 | 2015 |
数字孪生及其应用探索 陶飞, 刘蔚然, 刘检华, 刘晓军, 刘强, 屈挺, 胡天亮, 张执南, 向峰, ... 计算机集成制造系统 24 (1), 1-18, 2018 | 113 | 2018 |
An optimization method for shopfloor material handling based on real-time and multi-source manufacturing data Y Zhang, G Zhang, W Du, J Wang, E Ali, S Sun International Journal of Production Economics 165, 282-292, 2015 | 94 | 2015 |
一种基于物联技术的制造执行系统实现方法与关键技术 张映锋, 赵曦滨, 孙树栋, 王军强, 司书宾 计算机集成制造系统 18 (012), 2634-2642, 2012 | 77* | 2012 |
Theory of constraints product mix optimisation based on immune algorithm JQ Wang, SD Sun, SB Si, HA Yang International Journal of Production Research 47 (16), 4521-4543, 2009 | 65 | 2009 |
A cooperative approach to service booking and scheduling in cloud manufacturing J Chen, GQ Huang, JQ Wang, C Yang European Journal of Operational Research 273 (3), 861-873, 2019 | 61 | 2019 |
Synchronisation of production scheduling and shipment in an assembly flowshop J Chen, GQ Huang, H Luo, J Wang International Journal of Production Research 53 (9), 2787-2802, 2015 | 53 | 2015 |
Scheduling jobs with equal-processing-time on parallel machines with non-identical capacities to minimize makespan JQ Wang, JYT Leung International Journal of Production Economics 156, 325-331, 2014 | 41 | 2014 |
集成化生产计划管理与控制模型 王军强, 孙树栋, 余建军, 孙强 计算机集成制造系统 11 (009), 1223-1228, 2005 | 37 | 2005 |
组件化和集成化车间生产管理系统的研究与实现 王军强, 孙树栋, 司书宾, 褚崴, 于晓义 计算机集成制造系统 12 (2), 231-239, 2006 | 33* | 2006 |
Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes JQ Wang, GQ Fan, Y Zhang, CW Zhang, JYT Leung European Journal of Operational Research 258 (2), 478-490, 2017 | 32 | 2017 |
The TOC-based algorithm for solving multiple constraint resources: A re-examination JQ Wang, ZT Zhang, J Chen, YZ Guo, S Wang, SD Sun, T Qu, GQ Huang IEEE Transactions on Engineering Management 61 (1), 138-146, 2013 | 31 | 2013 |
基于正交试验的作业车间瓶颈识别方法 翟颖妮, 孙树栋, 王军强, 王萌 计算机集成制造系统 16 (09), 0, 2010 | 31* | 2010 |
Schedule-based execution bottleneck identification in a job shop JQ Wang, J Chen, Y Zhang, GQ Huang Computers & Industrial Engineering 98, 308-322, 2016 | 28 | 2016 |
基于组件的设备管理信息系统的研究与实现 王军强, 孙树栋, 柴永生, 司书宾 计算机集成制造系统 10 (9), 1095-1099, 2004 | 28* | 2004 |
基于约束理论的制造单元管理与控制研究 王军强, 孙树栋, 王东成, 杨宏安 计算机集成制造系统 12 (007), 1108-1116, 2006 | 27* | 2006 |
MRPⅡ, JIT, TOC 生产计划与控制比较研究 王军强, 张翠林, 孙树栋, 付平 制造业自动化 27 (2), 9-13, 2005 | 27 | 2005 |
Job shop bottleneck detection based on orthogonal experiment Y Zhai, S Sun, J Wang, G Niu Computers & Industrial Engineering 61 (3), 872-880, 2011 | 25 | 2011 |
Research on initiative scheduling mode for a physical internet-based manufacturing system J Wang, G Fan, F Yan, Y Zhang, S Sun The International Journal of Advanced Manufacturing Technology 84, 47-58, 2016 | 24 | 2016 |
Two decompositions for the bicriteria job-shop scheduling problem with discretely controllable processing times G Niu, S Sun, P Lafon, Y Zhang, J Wang International Journal of Production Research 50 (24), 7415-7427, 2012 | 22 | 2012 |