Cooperative inventory model for vendor-buyer system with unequal-sized shipment, defective items and carbon emission cost WA Jauhari, AS Pamuji, CN Rosyidi International Journal of Logistics Systems and Management 2 19 (2), 163-186, 2014 | 51 | 2014 |
A closed-loop supply chain model with rework, waste disposal, and carbon emissions WA Jauhari, NAFP Adam, CN Rosyidi, IN Pujawan, NH Shah Operations Research Perspectives 7, 100155, 2020 | 36 | 2020 |
Determination Inventory Level for Aircraft Spare Parts Using Continuous Review Model CNR Azizah Aisyati, Wakhid Ahmad Jauhari International Journal of Business Research and Management 4 (1), 2013 | 32* | 2013 |
Integrated inventory model for single vendor single buyer with probabilistic demand WA Jauhari, IN Pujawan, SE Wiratno, Y Priyandari International Journal of Operational Research 11 (2), 160-178, 2011 | 32 | 2011 |
A closed-loop supply chain inventory model with stochastic demand, hybrid production, carbon emissions, and take-back incentives WA Jauhari, IN Pujawan, M Suef Journal of Cleaner Production 320, 128835, 2021 | 30 | 2021 |
Joint economic lot size (JELS) model for single-vendor single-buyer with variable production rate and partial backorder WA Jauhari, IN Pujawan International Journal of Operational Research 20 (1), 91-108, 2014 | 27 | 2014 |
Investigating carbon emissions in a production-inventory model under imperfect production, inspection errors and service-level constraint RS Saga, WA Jauhari, PW Laksono, AR Dwicahyani International Journal of Logistics Systems and Management 34 (1), 29-55, 2019 | 25 | 2019 |
A stochastic periodic review inventory model for vendor–buyer system with setup cost reduction and service–level constraint WA Jauhari, RS Saga Production & Manufacturing Research 5 (1), 371-389, 2017 | 24 | 2017 |
Integrated vendor-buyer model with defective items, inspection error and stochastic demand WA Jauhari International Journal of Mathematics in Operational Research 8 (3), 342-359, 2016 | 24 | 2016 |
An integrated inventory model for supplier-manufacturer-retailer system with imperfect quality and inspection errors WA Jauhari, A Sofiana, NA Kurdhi, PW Laksono International Journal of Logistics Systems and Management 24 (3), 383-407, 2016 | 23 | 2016 |
A collaborative inventory model for vendor-buyer system with stochastic demand, defective items and carbon emission cost WA Jauhari International Journal of Logistics Systems and Management 29 (2), 241-269, 2018 | 22 | 2018 |
Integrating the analytic hierarchy process and importance-performance analysis into ISO 14001 framework for assessing campus sustainability SNW Pramono, MM Ulkhaq, R Trianto, PR Setiowati, DR Rasyida, ... AIP Conference Proceedings 1902 (1), 020035, 2017 | 22 | 2017 |
A fuzzy periodic review integrated inventory model involving stochastic demand, imperfect production process and inspection errors WA Jauhari, S Mayangsari, NA Kurdhi, KY Wong Cogent Engineering 4 (1), 1308653, 2017 | 22 | 2017 |
Integrated inventory model for three-layer supply chains with stochastic demand WA Jauhari International Journal of Operational Research 13 (3), 295-317, 2012 | 22 | 2012 |
A collaborative supply chain inventory model with defective items, adjusted production rate and variable lead time WA Jauhari, NP Sejati, CN Rosyidi International Journal of Procurement Management 9 (6), 733-750, 2016 | 21 | 2016 |
An integrated inventory model for single-vendor single-buyer system with freight rate discount and stochastic demand AA Wakhid Ahmad Jauhari, Ayudia Fitriyani International Journal of Operational Research 25 (3), 327-350, 2016 | 21 | 2016 |
A closed-loop supply chain under retail price and quality dependent demand with remanufacturing and refurbishing AY Christy, BN Fauzi, NA Kurdi, WA Jauhari, DRS Saputro Journal of Physics: Conference Series 855 (1), 012009, 2017 | 20 | 2017 |
Analisis Pengendalian Persediaan Spare Part Mesin Produksi di PT. Prima Sejati Sejahtera dengan Metode Continuous Review E Budiningsih, WA Jauhari PERFORMA: Media Ilmiah Teknik Industri 16 (2), 2017 | 19 | 2017 |
Inventory decisions in a two-echelon system with remanufacturing, carbon emission, and energy effects AR Dwicahyani, WA Jauhari, CN Rosyidi, PW Laksono Cogent Engineering 4 (1), 1379628, 2017 | 19 | 2017 |
Integrated inventory model for single-vendor single-buyer with imperfect production process WA Jauhari International Journal of Operational Research 20 (3), 283-300, 2014 | 19 | 2014 |