Follow
MFF Ab. Rashid
Title
Cited by
Cited by
Year
A review on assembly sequence planning and assembly line balancing optimisation using soft computing approaches
MFF Rashid, W Hutabarat, A Tiwari
The International Journal of Advanced Manufacturing Technology 59 (1), 335-349, 2012
2122012
A review of two-sided assembly line balancing problem
MRA Make, MFFA Rashid, MM Razali
The International Journal of Advanced Manufacturing Technology 89 (5), 1743-1763, 2017
772017
Surface roughness prediction for CNC milling process using artificial neural network
MFFA Rashid, MRA Lani
Proceedings of the World Congress on Engineering 3, 1-6, 2010
482010
Mathematical modeling to predict surface roughness in CNC milling
MFF Ab Rashid, SY Gan, NY Muhammad
World Academy of Science, Engineering and Technology 53, 393-396, 2009
302009
Optimization of Assembly Sequence Planning Using Soft Computing Approaches: A Review
MA Abdullah, MFF Ab Rashid, Z Ghazalli
Archives of Computational Methods in Engineering 26 (2), 461-474, 2019
272019
A review of multi-holes drilling path optimization using soft computing approaches
NWZ Abidin, MFF Ab Rashid, NMZN Mohamed
Archives of Computational Methods in Engineering 26 (1), 107-118, 2019
252019
A hybrid Ant-Wolf Algorithm to optimize assembly sequence planning problem
MFF Ab Rashid
Assembly Automation, 2017
252017
Lean manufacturing implementation in reducing waste for electronic assembly line
NH Zakaria, NMZN Mohamed, MFFA Rashid, ANM Rose
MATEC Web of Conferences 90, 01048, 2017
252017
Parametric Optimization of magneto-rheological fluid damper using particle swarm optimization
MR Azraai, G Priyandoko, AR Yusoff, M Rashid
International Journal of Automotive and Mechanical Engineering 11, 2591, 2015
212015
Similarities of lean manufacturing approaches implementation in SMEs towards the success: Case study in the automotive component industry
ANM Rose, MFF Ab Rashid, NMZN Mohamed, H Ahmad
MATEC Web of Conferences 87, 02024, 2017
202017
Mathematical modelling of mixed-model assembly line balancing problem with resources constraints
MM Razali, MFFA Rashid, MRA Make
IOP Conference Series: Materials Science and Engineering 160 (1), 012002, 2016
182016
Ergonomics study for workers at food production industry
HM Fazi, NMZN Mohamed, MFF Ab Rashid, ANM Rose
MATEC Web of Conferences 90, 01003, 2017
172017
Production layout improvement for steel fabrication works
N Mohamed, MFF Rashid, AN Rose, WY Ting
Journal of Industrial and Intelligent Information 3 (2), 2015
172015
Dimensional accuracy study of open cellular structure CoCrMo alloy fabricated by selective laser melting process
ZA Mat Taib, WANSW Harun, SAC Ghani, MFF Ab Rashid, MA Omar, ...
Advanced materials research 1133, 280-284, 2016
142016
Simulation Study of A Vehicle Production Line For Productivity Improvement
Ab Rashid, M.F.F., Nik Mohamed, N.M.Z., Mohd Rose, A.N. and Kor, K.Y.
Journal of Mechanical Engineering and Sciences (JMES) 8, 1283-1292, 2015
14*2015
Finite element simulation of laser-micromachining
NSM Shalahim, TT Mon, MF Ismail, MFF Rashid, MRM Rejab
World Congress on Engineering 2012. July 4-6, 2012. London, UK. 2182, 2221-2223, 2010
132010
Multi-objective discrete particle swarm optimisation algorithm for integrated assembly sequence planning and assembly line balancing
MFF Ab Rashid, W Hutabarat, A Tiwari
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2018
102018
Tiki-taka algorithm: a novel metaheuristic inspired by football playing style
MFF Ab Rashid
Engineering Computations, 2020
92020
Energy efficient modeling and optimization for assembly sequence planning using moth flame optimization
A Abdullah, MFF Ab Rashid, SG Ponnambalam, Z Ghazalli
Assembly Automation 39 (2), 356-368, 2019
92019
Modelling of simple assembly line balancing problem type 1 (SALBP-1) with machine and worker constraints
NH Kamarudin, MFFA Rashid
Journal of Physics: Conference Series 1049 (1), 012037, 2018
92018
The system can't perform the operation now. Try again later.
Articles 1–20