Follow
Ade Irman Saeful Mutaqin S
Ade Irman Saeful Mutaqin S
Verified email at untirta.ac.id - Homepage
Title
Cited by
Cited by
Year
Optimalisasi rute distribusi air minum quelle dengan algoritma clarke & wright saving dan model vehicle routing problem
AI SM, R Ekawati, N Febriana
Prosiding SENIATI 3 (2), C1. 1-7, 2017
292017
Integration house of risk and analytical network process for supply chain risk mitigation of cassava opak chips industry
N Ummi, PF Ferdinant, A Irman, A Gunawan
MATEC Web of Conferences 218, 04022, 2018
122018
Pengembangan Proses Produksi Opak Singkong di Kabupaten Pandeglang melalui Implementasi Mesin Pencetak
A Gunawan, N Ummi, PF Ferdinant, A Irman
Jurnal Pengabdian Pada Masyarakat 3 (2), 185-194, 2018
112018
Design of warehouse model with dedicated policy to minimize total travel costs: a case study in a construction workshop
A Irman, Y Muharni, A Yusuf
IOP Conference Series: Materials Science and Engineering 909 (1), 012088, 2020
92020
Increased productivity using lean service (Case study: regional drinking water company x)
A Irman, A Anwari
IOP Conference Series: Materials Science and Engineering 909 (1), 012086, 2020
82020
Minimizing makespan on flow shop scheduling using Campbel Dudek and Smith, particle swarm optimization, and proposed heuristic algorithm
A Irman, E Febianti, U Khasanah
IOP Conference Series: Materials Science and Engineering 673 (1), 012099, 2019
82019
Evaluation of power plant reliability using index loss of load in the Suralaya power plant
PF Ferdinant, L Nurdiana, A Irman
IOP Conference Series: Materials Science and Engineering 909 (1), 012070, 2020
62020
Optimalisasi sumber daya di UKM Batik Banten Mukarnas Center
DL Trenggonowati, A Ridwan, A Irman, A Umyati
Teknika: Jurnal Sains dan Teknologi 16 (1), 83-96, 2020
62020
Perancangan sistem pemerintahan berbasis elektronik (SPBE) yang berkelanjutan di Provinsi Banten
S Supriyanto, A Ridwan, R Tamam, MI Santoso, D Satria, AIS Mutaqin
Journal Industrial Servicess 7 (1), 171-175, 2021
52021
Implementation of lean manufacturing using waste assessment model model (WAM) in food industry (case study in usaha mikro kecil menengah (umkm) xyz)
E Febianti, A Irman, M Juliana
IOP Conference Series: Materials Science and Engineering 909 (1), 012066, 2020
52020
Integration of Quality Function Deployment (QFD) and Fuzzy Theory Model for Improving Quality of Cassava Opak Chips
N Ummi, HF Ferdinant, AI SM, A Gunawan
Quality Engineering 13 (3), 309-317, 2018
52018
Perancangan Tata Letak Gudang Menggunakan Kebijakan Dedicated Storage untuk Minimasi Total Jarak Tempuh di PT XYZ
A Irman, RD Septiani
Journal Industrial Servicess 6 (1), 45-48, 2020
42020
Pemberdayaan Masyarakat dalam Meningkatkan Ekonomi Dengan Inovasi Olahan Pisang
NM Dewantari, AIS Mutaqin, AS Mariawati, L Herlina, B Kurniawan
J-ABDIPAMAS (Jurnal Pengabdian Kepada Masyarakat) 6 (1), 83-88, 2022
32022
Developing supply chain network with piecewise linear transportation cost for a small-and-medium enterprise (SME) in Cilegon
B Kurniawan, A Irman, A Gunawan, A Umyati, E Febianti, N Wahyuni, ...
Majalah Ilmiah Pengkajian Industri 15 (2), 97-104, 2021
32021
Prediction of Grinding Work Roll Demand in a Job Shop Company By using Artificial Neural Network and ARIMA Method
Y Muharni, A Irman, M Ilhamsyah
MATEC Web of Conferences 218, 04004, 2018
32018
Analisa Penerapan Sistem Manajemen Mutu ISO 9001: 2008 di PT. XYZ
A Saputri, PB Katili
Jurnal Teknik Industri Untirta, 2017
32017
Perancangan rute pergerakan material handling crane pada operasional gudang barang jadi menggunakan ant colony optimization
Y Muharni, L Herlina, B Kurniawan, MA Ilhami, K Kulsum, E Febianti, ...
Journal Industrial Servicess 7 (2), 289-294, 2022
22022
Bibliometric Analysis of University Timetabling Using Publish and Perish
DL Trenggonowati, L Herlina, E Febianti, MA Ilhami, Y Muharni, ...
Conference on Broad Exposure to Science and Technology 2021 (BEST 2021), 307-311, 2022
22022
Pengukuran Kriteria Green and Smart Campus dengan Metode Analytical Hierarchy Process
PF Ferdinant, AIS Mutaqin, N Wahyuni
Journal Industrial Servicess 6 (2), 223-229, 2021
22021
The application of LPT, CEGA, and PSO method on flow shop scheduling with parallel machine
Y Muharni, A Irman, E Febianti, TE Rubyanti, NN Sofa
IOP Conference Series: Materials Science and Engineering 909 (1), 012054, 2020
22020
The system can't perform the operation now. Try again later.
Articles 1–20