Follow
Istiar
Istiar
Department of Civil Engineering, Institut Teknologi Sepuluh Nopember
Verified email at ce.its.ac.id
Title
Cited by
Cited by
Year
Evaluation of Indonesia road safety campaigns (RUNK)
H Widyastuti, RG Thompson, R Tay, M Huda, F Widiywati, AR Prabawati
Procedia-Social and Behavioral Sciences 227, 530-535, 2016
82016
Evaluasi Kebutuhan Luasan Apron Pada Rencana Pengembangan Bandar Udara Internasional Ahmad Yani Semarang
M Nursalim, E Ahyudanari, I Istiar
Jurnal Teknik ITS 6 (1), E12-E16, 2017
62017
Studi Kelayakan Pembangunan Fly Over di Simpang Gedangan Sidoarjo Ditinjau dari Segi Lalu Lintas dan Ekonomi Jalan Raya
N Firmansyah, I Istiar
Jurnal Teknik ITS 5 (2), E66-E70, 2016
62016
Studi Kelayakan Pembangunan Jalan Lingkar Timur Mojosari Kabupaten Mojokerto
A Istiyawan, M ISTIAR
Surabaya: ITS, 2010
62010
Evaluasi Ketersediaan Ruang Udara Dalam Kaitannya Dengan Keselamatan Operasional Penerbangan Di Bandara Abdul Rachman Saleh
DB Zahra, E Ahyudanari, I Istiar
Jurnal Teknik ITS 6 (2), E74-E79, 2017
42017
Evaluasi Ketersediaan Gate Di Terminal 3 Ultimate Bandar Udara Internasional Soekarno-Hatta
AN Pradana, E Ahyudanari, I Istiar
Jurnal Teknik ITS 6 (1), E1-E5, 2017
42017
Evaluation of Responsible Riding Program on Reducing Number of Motorcycle Accident
H Widyastuti, A Widyanie, M Fathir, AAG Kartika
Proceedings of the Eastern Asia Society for Transportation Studies Vol. 7 …, 2009
42009
Evaluasi Kesesuaian Jadwal Pemeliharaan Runway dengan Pertumbuhan Pergerakan Pesawat di Bandar Udara Juanda
F Kristiawan, E Ahyudanari, I Istiar
Jurnal Teknik ITS 6 (2), E63-E67, 2018
22018
The Analysis of Safe Riding Campaign in Surabaya, Indonesia
AAG KARTIKA, H Widyatuti, C Buana, I Istiar
Proceedings of the Eastern Asia Society for Transportation Studies Vol. 7 …, 2009
22009
The Responses of Road Users on Safety Riding Campaign in Surabaya
AAG Kartika, H Widyastuti, W Herijanto, C Buana
Civil Engineering Dimension 10 (2), 118-130, 2008
22008
Analisis Kekuatan Perkerasan Landas Pacu Bandar Udara Juanda Dengan Metode FAA dan Software COMFAA
Istiar, SK Aziz
Jurnal Aplikasi Teknik Sipil 19 (2), 159-166, 2021
12021
Review study of irregularity track monitoring based on inertial measure unit and power spectral density analysis
H Widyastuti
IOP Conference Series: Materials Science and Engineering 650 (1), 012046, 2019
12019
Taxiway Pavement Evaluation to Support the Operational of Terminal 2 Juanda Airport
I Istiar, IB Mochtar, W Herijanto, CA Prastyanto
IPTEK Journal of Proceedings Series 3 (5), 2017
12017
Studi Perencanaan Moda Transportasi Penumpang Antar Terminal Bandara Juanda Surabaya
ID Priatna, E Ahyudanari, I Istiar
Jurnal Teknik ITS 6 (2), E85-E90, 2017
12017
Perencanaan Geometrik dan Perkerasan Jalan Tol Pandaan-Malang dengan Jenis Perkerasan Lentur
MB Wicaksono, I Istiar
Jurnal Teknik ITS 5 (2), E71-E76, 2016
12016
Analisis Derajat Kejenuhan (DS) U-Turn dan Simpang Taman Bungkul Surabaya
M Huda, W Herijanto, I Istiar, H Widyastuti
Prosiding Forum Studi Transportasi antar Perguruan Tinggi, 2016
12016
Kajian Pelaksanaan Kanalisasi Sebagai Bagian dari Safe Riding Campaign di Kota Surabaya Ditinjau dari Kinerja Ruas dan Simpang
AAG Kartika, H Widyastuti, W Herijanto, C Buana, CA Prastyanto, ...
The Proceeding of 11 th Symposium of The Inter-University Transportation …, 2008
12008
Perancangan Geometrik Simpang Susun Jalan Tol Yogyakarta-Bawen
SN Sjadja'ah, W Herijanto, I Istiar
Jurnal Teknik ITS 12 (1), E14-E20, 2023
2023
The effect of laterite stone as filler on marshall stability hot mix asphalt AC-WC
TJW Adi, M Kencanawati, I Siara
MATEC Web of Conferences 258, 01003, 2019
2019
Transport Demand and Traffic Engineering Scheme in The Street Space Reallocation Plan For The Future Tram Track
W Herijanto, H Widyastuti, AAG Kartika, B Rahardjo, CA Prastyanto, I Istiar
Jurnal Transportasi: Sistem, Material, dan Infrastruktur 1 (1), 44-52, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–20