Follow
Mohammad Hassan Sebt
Title
Cited by
Cited by
Year
Construction safety risk drivers: A BIM approach
H Malekitabar, A Ardeshir, MH Sebt, R Stouffs
Safety science 82, 445-455, 2016
1772016
Competency-based selection and assignment of human resources to construction projects
V Shahhosseini, MH Sebt
Scientia Iranica 18 (2), 163-180, 2011
1682011
Prediction of bond strength of spliced steel bars in concrete using artificial neural network and fuzzy logic
EM Golafshani, A Rahai, MH Sebt, H Akbarpour
Construction and building materials 36, 411-418, 2012
1302012
Computing with words for hierarchical competency based selection of personnel in construction companies
SS Gilan, MH Sebt, V Shahhosseini
Applied Soft Computing 12 (2), 860-871, 2012
952012
Artificial neural network and genetic programming for predicting the bond strength of GFRP bars in concrete
EM Golafshani, A Rahai, MH Sebt
Materials and structures 48, 1581-1602, 2015
862015
Bond behavior of steel and GFRP bars in self-compacting concrete
EM Golafshani, A Rahai, MH Sebt
Construction and Building Materials 61, 230-240, 2014
722014
A type-2 fuzzy set model for contractor prequalification
MR Afshar, Y Alipouri, MH Sebt, WT Chan
Automation in Construction 84, 356-366, 2017
552017
Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem
MH Sebt, MR Afshar, Y Alipouri
Engineering Optimization 49 (3), 513-530, 2017
502017
Potential application of GIS to layout of construction temporary facilities
MH Sebt, KE PARVARESH, MR Delavar
International Journal of Civil Engineering 6 (4), 235-245, 2008
352008
A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem
Y Alipouri, MH Sebt, A Ardeshir, MHF Zarandi
Operational Research 20, 197-217, 2020
342020
Characteristics of the construction industry from the marketing viewpoint: Challenges and solutions
M Mokhtariani, MH Sebt, H Davoudpour
Civil engineering journal 3 (9), 701-714, 2017
312017
Solving the FS-RCPSP with hyper-heuristics: A policy-driven approach
Y Alipouri, MH Sebt, A Ardeshir, WT Chan
Journal of the Operational Research Society 70 (3), 403-419, 2019
262019
Solving resource-constrained project scheduling problem with evolutionary programming
MH Sebt, Y Alipouri, Y Alipouri
Journal of the Operational Research Society 64, 1327-1335, 2013
252013
Construction marketing: developing a reference framework
M Mokhtariani, MH Sebt, H Davoudpour
Advances in Civil Engineering 2017, 2017
242017
An Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
MH Sebt, MR Afshar, Y Alipouri
International Journal of Supply and Operations Management 2 (3), 905-924, 2015
222015
Competency based optimized assignment of project managers to projects
MH Sebt, V Shahhosseini, M Rezaei
2010 12th International Conference on Computer Modelling and Simulation, 311-316, 2010
202010
Multi-objective optimization of dynamic construction site layout using BIM and GIS
M Zavari, V Shahhosseini, A Ardeshir, MH Sebt
Journal of Building Engineering 52, 104518, 2022
192022
The optimal TADAS damper placement in moment resisting steel structures based on a cost-benefit analysis
MH Sebt, A Yousefzadeh, M Tehranizadeh
International Journal of Civil Engineering 9 (1), 23-32, 2011
192011
A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem
MR Afshar, V Shahhosseini, MH Sebt
International Journal of Construction Management 22 (3), 357-365, 2022
182022
Exploring critical success factors in urban housing projects using fuzzy analytic network process
H Youneszadeh, A Ardeshir, MH Sebt
Civil Engineering Journal 3 (11), 1048-1067, 2017
162017
The system can't perform the operation now. Try again later.
Articles 1–20