Prof.Ismail Abdul Rahman.PhD (Manchester, UK)
Prof.Ismail Abdul Rahman.PhD (Manchester, UK)
Verified email at UTHM.edu.my
Title
Cited by
Cited by
Year
Significant factors causing cost overruns in large construction projects in Malaysia
I Abdul Rahman, AH Memon, AT Abdul Karim
Journal of Applied Science 13 (2), 286-293, 2013
1592013
Factors affecting construction cost in Mara large construction project: perspective of project management consultant
AH Memon, IA Rahman, MR Abdullah, AAA Azis
International Journal of Sustainable Construction Engineering and Technology …, 2010
1542010
The way forward in sustainable construction: issues and challenges
JM Hussin, IA Rahman, AH Memon
International Journal of Advances in Applied Sciences 2 (1), 15-24, 2013
1452013
Time and cost performance of construction projects in southern and central regions of Peninsular Malaysia
I Abdul Rahman, AH Memon, S Nagapan, QBA Imran Latif, AA Abdul Azis
1312012
Preliminary study on causative factors leading to construction cost overrun
AH Memon, IA Rahman, AAA Azis
International Journal of Sustainable Construction Engineering and Technology …, 2011
1192011
Factors contributing to physical and non-physical waste generation in construction industry
S Nagapan, IA Rahman, A Asmi
International Journal of Advances in Applied Sciences 1 (1), 1-10, 2012
732012
Factors affecting construction cost performance in project management projects: Case of MARA large projects
AH Memon, IA Rahman, MR Abdullah, AAA Azis
International Journal of Civil Engineering and Built Environment 1 (1), 30-35, 2014
722014
Identifying causes of construction waste–case of Central Region of Peninsula Malaysia
S Nagapan, IA Rahman, A Asmi, AH Memon, RM Zin
International Journal of Integrated Engineering 4 (2), 2012
692012
Assessment of recycled aggregate concrete
IA Rahman, H Hamdam, AMA Zaidi
Modern Applied Science 3 (10), 47-54, 2009
692009
BIM in Malaysian construction industry: status, advantages, barriers and strategies to enhance the implementation level
AH Memon, IA Rahman, I Memon, NIA Azman
Research Journal of Applied Sciences, Engineering and Technology 8 (5), 606-614, 2014
642014
SEM-PLS analysis of inhibiting factors of cost performance for large construction projects in Malaysia: perspective of clients and consultants
AH Memon, IA Rahman
The Scientific World Journal 2014, 2014
612014
Selection of typical weather data (test reference years) for Subang, Malaysia
IA Rahman, J Dewsbury
Building and Environment 42 (10), 3636-3641, 2007
592007
Preliminary study of compressed stabilized earth brick (CSEB)
FV Riza, IA Rahman, AMA Zaidi
Australian Journal of Basic and Applied Sciences 5 (9), 6-12, 2011
562011
Causes of delay in MARA management procurement construction projects
MR Abdullah, IA Rahman, AAA Azis
Journal of Surveying, Construction and Property 1 (1), 2010
542010
Relationship between factors of construction resources affecting project cost
IA Rahman, AH Memon, ATA Karim
Modern Applied Science 7 (1), 67-75, 2013
532013
Controlling Cost Overrun Factors in Construction Projects in Malaysia
ATAK Ade Asmi Abdul Azis, Aftab Hameed Memon, Ismail
Research Journal of Applied Sciences, Engineering and Technology 5 (8), 2621 …, 2013
532013
Study of site's construction waste in Batu Pahat, Johor
S Nagapan, IA Rahman, A Asmi, NF Adnan
Procedia Engineering 53, 99-103, 2013
532013
Time overrun in construction projects from the perspective of project management consultant (PMC)
AH Memon, I Abdul Rahman, AAA Aziz
Journal of Surveying, Construction and Property 2 (1), 2011
512011
Significant causes and effects of variation orders in construction projects
AH Memon, IA Rahman, MFA Hasan
Research Journal of Applied Sciences, Engineering and Technology 7 (21 …, 2014
502014
A brief review of compressed stabilized earth brick (CSEB)
FV Riza, IA Rahman, AMA Zaidi
2010 International Conference on Science and Social Research (CSSR 2010 …, 2010
482010
The system can't perform the operation now. Try again later.
Articles 1–20