Peniel Ang Soon Ern
Peniel Ang Soon Ern
Faculty of Civil Engineering Technology (Construction) @ Universiti Tun Hussein Onn Malaysia (UTHM)
Verified email at uthm.edu.my
Title
Cited by
Cited by
Year
The awareness of ICT implementation for materials management in construction projects
NB Kasim, PAS Ern
Int. J. of Computer and Communication Technology 2 (1), 1-10, 2010
272010
Implementation of ICT in Materials Management in Construction Projects
P Ang, NB Kasim
Degree Thesis, University Tun Hussein Onn Malaysia, 2009
72009
ICT-readiness in Industrialised Building System (IBS) management processes: case studies
PSE Ang, N Kasim
62013
Overcoming ICT barriers in IBS management process in Malaysia construction industry
PAS Ern, N Kasim, MAN Masrom, GK Chen
MATEC Web of Conferences 103, 03007, 2017
42017
E-readiness for Industrialised Building System (IBS) components management: Exploratory study in Malaysian construction projects
PAS Ern, NB Kasim
2012 International Conference on Innovation Management and Technology …, 2012
32012
Properties of Cement Brick Containing Expanded Polystyrene Beads (EPS) And Palm Oil Fuel Ash (POFA)
MNAWA N.A. Kamarulzaman, S.H. Adnan, K.A. Mohd Sari, M.H. Osman, M.L. Ahmad ...
Journal of Science and Technology 10 (4), 41-46, 2018
22018
Barrier-driver model for enhancement of ICT implementation in IBS production process management in construction industry
PSE Ang
Universiti Tun Hussein Onn Malaysia, 2015
22015
Critical Ict-Inhibiting Factors On Ibs Production Management Processes In The Malaysia Construction Industry
GKC Peniel Ang Soon Ern, Narimah Kasim, Zuhairi Abd Hamid
The Spearheading Of Industrialised Building System (Ibs) In Malaysia 1, 11, 2018
1*2018
Critical ICT-Inhibiting Factors on IBS Production Management Processes in the Malaysia Construction Industry
ZAHGKC Peniel Ang Soon Ern, Narimah Kasim
IOP Conference Series: Materials Science and Engineering 245 (3), 2017
1*2017
Acceptance of the Application of Sustainable Concept in Malaysia’s Waste Management Infrastructure-Landfill
TJ Sin, GK Chen, PAS Ern
MATEC Web of Conferences 103, 05012, 2017
12017
Drivers to enhance ICT uptake in IBS management processes in the construction industry
PAS Ern, N Kasim, GK Chen
MATEC Web of Conferences 47, 04016, 2016
12016
Comparative Study on the Perspective towards the Benefits and Hindrances of Implementing Building Information Modelling (BIM)
YYAA Peniel Ang Soon Ern, Yong Yee Ooi
INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY …, 2020
2020
BIM: The setback OR solution to project cost issues in Malaysia?
MKMMAAR P S E Ang, Y L Pung, K L Tsai, M NA Zulkaply, J S Tey, N B Kasim, M ...
2nd International Conference on Civil & Environmental Engineering (CENVIRON …, 2020
2020
Study on thermal performance of precast concrete sandwich panel (PCSP) design for sustainable built environment
PA Soon Ern, ML Lim
Penerbit UTHM 1, 31-47, 2018
2018
A study on schedule management for BIM projects in the construction industry
PA Soon Ern, R Ali, CY Ooi
Penerbit UTHM 1, 139-148, 2018
2018
A Study On The Construction Waste Management Practice In Johor
PASE Nia Syahirah Binti Mohd Azlan
Sustainable Construction And Building Technology 1, 19, 2018
2018
Sustainable Impact of Landfill Siting towards Urban Planning in Malaysia
J Sin Tey, KC Goh, PS Ern Ang
MS&E 245 (5), 052052, 2017
2017
Thermal Performance of Precast Concrete Sandwich Panel (PCSP) Design for Sustainable Built Environment
PAS Ern, LM Ling, N Kasim, Z Abd Hamid, MANB Masrom
MS&E 245 (3), 032073, 2017
2017
Thermal performance of precast concrete sandwich panel (PCSP) design for sustainable built environment
PSE Ang, ML Lim, N Kasim, Z Abd Hamid, MAN Masrom
2017
Critical ICT-inhibiting factors on IBS production management processes in the Malaysia construction industry
PSE Ang, N Kasim, Z Abd Hamid, KC Goh
2017
The system can't perform the operation now. Try again later.
Articles 1–20