Analysing factors affecting delays in Indian construction projects
H Doloi, A Sawhney, KC Iyer, S Rentala
International Journal of Project Management, 2011
7712011
Structural equation model for assessing impacts of contractor's performance on project success
H Doloi, KC Iyer, A Sawhney
International journal of project management 29 (6), 687-695, 2011
2942011
Structural equation model for investigating factors affecting delay in Indian construction projects
H Doloi, A Sawhney, KC Iyer
Construction Management and Economics 30 (10), 869-884, 2012
1332012
Construction 4.0
A Sawhney, M Riley, J Irizarry, M Riley
Edited by A. Sawhney, Michael Riley, and J. Irizarry. Routledge. doi 10 …, 2020
1052020
Adaptive probabilistic neural network-based crane type selection system
A Sawhney, A Mund
Journal of construction engineering and management 128 (3), 265-273, 2002
942002
Internet based interactive construction management learning system
A Sawhney, J Koczenasz, B Bashford, A Mund
2000 Annual Conference, 5.396. 1-5.396. 10, 2000
832000
Adoption of BIM by architectural firms in India: technology–organization–environment perspective
R Ahuja, M Jain, A Sawhney, M Arif
Architectural engineering and design management 12 (4), 311-330, 2016
812016
Issues of construction health and safety in developing countries: a case of Jordan
S Zaid Alkilani, J Jupp, A Sawhney
Australasian Journal of Construction Economics and Building, The 13 (3), 141-156, 2013
792013
Environmental impacts over the life cycle of residential buildings using different exterior wall systems
R Kahhat, J Crittenden, F Sharif, E Fonseca, K Li, A Sawhney, P Zhang
Journal of Infrastructure Systems 15 (3), 211-221, 2009
772009
Implications of even flow production methodology for US housing industry
HH Bashford, A Sawhney, KD Walsh, K Kot
Journal of construction engineering and management 129 (3), 330-337, 2003
762003
Factors influencing BIM adoption in emerging markets–the case of India
R Ahuja, A Sawhney, M Jain, M Arif, S Rakshit
International Journal of Construction Management 20 (1), 65-76, 2020
742020
Construction engineering and project management II: agent-based modeling and simulation in construction
A Sawhney, H Bashford, K Walsh, AR Mulky
Proceedings of the 35th conference on Winter simulation: driving innovation …, 2003
742003
Driving lean and green project outcomes using BIM: A qualitative comparative analysis
R Ahuja, A Sawhney, M Arif
International Journal of Sustainable Built Environment 6 (1), 69-80, 2017
702017
HSM-Simulation–Based planning method for construction projects
A Sawhney, SM AbouRizk
Journal of construction engineering and management 121 (3), 297-303, 1995
691995
Construction project simulation using CYCLONE
A Sawhney, SM AbouRizk, DW Halpin
Canadian Journal of Civil Engineering 25 (1), 16-25, 1998
661998
Production system loading–cycle time relationship in residential construction
HH Bashford, KD Walsh, A Sawhney
Journal of Construction Engineering and Management 131 (1), 15-22, 2005
642005
Subjective and interactive duration estimation
SM AbouRizk, A Sawhney
Canadian journal of civil engineering 20 (3), 457-470, 1993
601993
Modeling and analysis of concrete production plant using Petri nets
A Sawhney, O Abudayyeh, T Chaitavatputtiporn
Journal of Computing in Civil Engineering 13 (3), 178-186, 1999
551999
Grand challenges for the Indian construction industry
A Sawhney, R Agnihotri, VK Paul
Built Environment Project and Asset Management, 2014
502014
Area of linkage between lean construction and sustainability in Indian construction industry
S Dixit, SN Mandal, A Sawhney, S Singh
International Journal of Civil Engineering and Technology 8 (8), 2017
452017