Follow
Javad Rezaeian
Title
Cited by
Cited by
Year
GIS-based frequency ratio and index of entropy models for landslide susceptibility assessment in the Caspian forest, northern Iran
A Jaafari, A Najafi, HR Pourghasemi, J Rezaeian, A Sattarian
International Journal of Environmental Science and Technology 11, 909-926, 2014
4172014
Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions
JR Mojtaba Afzalirad
Computers & Industrial Engineering 98, 2016
1472016
Planning road networks in landslide-prone areas: A case study from the northern forests of Iran
A Jaafari, A Najafi, J Rezaeian, A Sattarian, I Ghajar
Land Use Policy 47, 198-208, 2015
892015
A realistic variant of bi-objective unrelated parallel machine scheduling problem: NSGA-II and MOACO approaches
JR M Afzali-Rad
Applied Soft Computing, 2017
752017
A robust hybrid approach based on particle swarm optimization and genetic algorithm to minimize the total machine load on unrelated parallel machines
MSS Mir, J Rezaeian
Applied Soft Computing 41, 488-504, 2016
702016
Two meta-heuristic algorithms for flexible flow shop scheduling problem with robotic transportation and release time
JR S S Zabihzadeh
Applied Soft Computing 40, 2016
622016
Spatial prediction of slope failures in support of forestry operations safety
A Jaafari, J Rezaeian, MSO Omrani
Croatian Journal of Forest Engineering: Journal for Theory and Application …, 2017
612017
Green vehicle routing and scheduling problem with heterogeneous fleet including reverse logistics in the form of collecting returned goods
RA Foroutan, J Rezaeian, I Mahdavi
Applied Soft Computing 94, 106462, 2020
572020
A multi-objective integrated cellular manufacturing systems design with dynamic system reconfiguration
N Javadian, A Aghajani, J Rezaeian, MJ Ghaneian Sebdani
The International Journal of Advanced Manufacturing Technology 56, 307-317, 2011
552011
A hybrid approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system
J Rezaeian, N Javadian, R Tavakkoli-Moghaddam, F Jolai
Applied Soft Computing 11 (6), 4195-4202, 2011
522011
Modeling erosion and sediment delivery from unpaved roads in the north mountainous forest of Iran
A Jaafari, A Najafi, J Rezaeian, A Sattarian
GEM-International Journal on Geomathematics 6 (2), 343-356, 2015
502015
Minimizing makespan for flow shop scheduling problem with intermediate buffers by using hybrid approach of artificial immune system
S Abdollahpour, J Rezaeian
Applied Soft Computing 28, 44-56, 2015
492015
A genetic algorithm for JIT single machine scheduling with preemption and machine idle time
H Khorshidian, N Javadian, M Zandieh, J Rezaeian, K Rahmani
Expert systems with applications 38 (7), 7911-7918, 2011
442011
Scheduling unrelated parallel machines with sequence-dependent setup times
JR Zeidi, S MohammadHosseini
The International Journal of Advanced Manufacturing Technology 81, 1487-1496, 2015
422015
An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times
SM Mousavi, I Mahdavi, J Rezaeian, M Zandieh
Operational Research, 1-36, 2017
412017
Robust meta-heuristics implementation for unrelated parallel machines scheduling problem with rework processes and machine eligibility restrictions
M Rambod, J Rezaeian
Computers & Industrial Engineering 77, 15-28, 2014
372014
Scheduling of multi-component products in a two-stage flexible flow shop
F Nikzad, J Rezaeian, I Mahdavi, I Rastgar
Applied Soft Computing 32, 132-143, 2015
312015
A hybrid multi-objective approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system
JR Zeidi, N Javadian, R Tavakkoli-Moghaddam, F Jolai
Computers & Industrial Engineering 66 (4), 1004-1014, 2013
302013
The mediating role of job satisfaction between spiritual intelligence and organizational commitment
H Cherati, I Mahdavi, J Rezaeian
International Journal of Research in Organizational Behaviour and Human …, 2013
302013
Design of high-performing hybrid meta-heuristics for unrelated parallel machine scheduling with machine eligibility and precedence constraints
M Afzalirad, J Rezaeian
Engineering Optimization 48 (4), 706-726, 2016
292016
The system can't perform the operation now. Try again later.
Articles 1–20