Coordinating supply chain inventories through common replenishment epochs S Viswanathan, R Piplani European Journal of Operational Research 129 (2), 277-286, 2001 | 472 | 2001 |
Supply-side collaboration and its value in supply chains Y Fu, R Piplani European Journal of Operational Research 152 (1), 281-288, 2004 | 211 | 2004 |
Vehicle scheduling and routing at a cross docking center for food supply chains D Agustina, CKM Lee, R Piplani International Journal of production economics 152, 29-41, 2014 | 192 | 2014 |
A review: Mathematical modles for cross docking planning D Agustina, CKM Lee, R Piplani International Journal of Engineering Business Management 2 (2), 47-54, 2010 | 163 | 2010 |
A study of repairable parts inventory system operating under performance-based contract H Mirzahosseinian, R Piplani European Journal of Operational Research 214 (2), 256-261, 2011 | 140 | 2011 |
Sustainable supply chain management R Piplani, N Pujawan, S Ray International Journal of Production Economics 111 (2), 193-194, 2008 | 125 | 2008 |
Perspectives on the use of information technology at third party logistics service providers in Singapore R Piplani, S Pokharel, A Tan Asia Pacific Journal of Marketing and Logistics 16 (1), 27-41, 2004 | 111 | 2004 |
A coordination framework for supply chain inventory alignment R Piplani, Y Fu Journal of manufacturing technology management 16 (6), 598-614, 2005 | 103 | 2005 |
Multi-agent enabled modeling and simulation towards collaborative inventory management in supply chains Y Fu, R Piplani, R de Souza, J Wu 2000 Winter Simulation Conference Proceedings (Cat. No. 00CH37165) 2, 1763-1771, 2000 | 91 | 2000 |
Forecasting aggregate demand: An analytical evaluation of top-down versus bottom-up forecasting in a production planning framework H Widiarta, S Viswanathan, R Piplani International Journal of Production Economics 118 (1), 87-94, 2009 | 83 | 2009 |
Redesigning closed-loop service network at a computer manufacturer: A case study RD Kusumastuti, R Piplani, GH Lim International Journal of Production Economics 111 (2), 244-260, 2008 | 82 | 2008 |
Value of information exchange and synchronization in a multi-tier supply chain S Viswanathan, H Widiarta, R Piplani International Journal of Production Research 45 (21), 5057-5074, 2007 | 66 | 2007 |
Robust optimisation approach to the design of service networks for reverse logistics R Piplani, A Saraswat International Journal of Production Research 50 (5), 1424-1437, 2012 | 64 | 2012 |
A model for evaluating supplier-owned inventory strategy R Piplani, S Viswanathan International Journal of Production Economics 81, 565-571, 2003 | 60 | 2003 |
A two-period supply contract model for a decentralized assembly system X Zou, S Pokharel, R Piplani European journal of operational research 187 (1), 257-274, 2008 | 57 | 2008 |
Evaluation of entropy-based dispatching in flexible manufacturing systems R Piplani, D Wetjens European Journal of Operational Research 176 (1), 317-331, 2007 | 54 | 2007 |
On the effectiveness of top‐down strategy for forecasting autoregressive demands H Widiarta, S Viswanathan, R Piplani Naval Research Logistics (NRL) 54 (2), 176-188, 2007 | 47 | 2007 |
Channel coordination in an assembly system facing uncertain demand with synchronized processing time and delivery quantity X Zou, S Pokharel*, R Piplani International journal of production research 42 (22), 4673-4689, 2004 | 44 | 2004 |
Forecasting item-level demands: an analytical evaluation of top–down versus bottom–up forecasting in a production-planning framework H Widiarta, S Viswanathan, R Piplani IMA Journal of Management Mathematics 19 (2), 207-218, 2008 | 43 | 2008 |
Simulation workbench for analysing multi‐echelon supply chains W Kian Ng, R Piplani, S Viswanathan Integrated manufacturing systems 14 (5), 449-457, 2003 | 42 | 2003 |