Xiwang Guo (郭希旺)
Xiwang Guo (郭希旺)
辽宁石油化工大学 & New Jersey Institute of Technology
Verified email at njit.edu
Title
Cited by
Cited by
Year
Disassembly sequence optimization for large-scale products with multiresource constraints using scatter search and Petri nets
X Guo, S Liu, MC Zhou, G Tian
IEEE Transactions on Cybernetics 46 (11), 2435-2446, 2015
1132015
Modified cuckoo search algorithm to solve economic power dispatch optimization problems
J Zhao, S Liu, M Zhou, X Guo, L Qi
IEEE/CAA Journal of Automatica Sinica 5 (4), 794-806, 2018
1062018
Lexicographic multiobjective scatter search for the optimization of sequence-dependent selective disassembly subject to multiresource constraints
X Guo, M Zhou, S Liu, L Qi
IEEE transactions on cybernetics 50 (7), 3307-3317, 2019
862019
Dual-Objective Program and Scatter Search for the Optimization of Disassembly Sequences Subject to Multiresource Constraints
I Xiwang Guo, Shixin Liu, MengChu Zhou, Fellow, IEEE, and Guangdong Tian, Member
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2017
782017
Scheduling dual-objective stochastic hybrid flow shop with deteriorating jobs via bi-population evolutionary algorithm
Y Fu, MC Zhou, X Guo, L Qi
IEEE Transactions on Systems, Man, and Cybernetics: Systems 50 (12), 5037-5048, 2019
492019
Multiresource-constrained selective disassembly with maximal profit and minimal energy consumption
X Guo, MC Zhou, S Liu, L Qi
IEEE Transactions on Automation Science and Engineering 18 (2), 804-816, 2020
392020
Timetable optimization for regenerative energy utilization in subway systems
H Liu, MC Zhou, X Guo, Z Zhang, B Ning, T Tang
IEEE Transactions on Intelligent Transportation Systems 20 (9), 3247-3257, 2018
382018
An improved binary cuckoo search algorithm for solving unit commitment problems: Methodological description
J Zhao, S Liu, M Zhou, X Guo, L Qi
IEEE Access 6, 43535-43545, 2018
382018
Decomposition method for new single-machine scheduling problems from steel production systems
Z Zhao, S Liu, MC Zhou, X Guo, L Qi
IEEE Transactions on Automation Science and Engineering 17 (3), 1376-1387, 2019
372019
Disassembly sequence planning: a survey
X Guo, MC Zhou, A Abusorrah, F Alsokhiry, K Sedraoui
IEEE/CAA Journal of Automatica Sinica 8 (7), 1308-1324, 2020
222020
Artificial-molecule-based chemical reaction optimization for flow shop scheduling problem with deteriorating and learning effects
Y Fu, M Zhou, X Guo, L Qi
Ieee Access 7, 53429-53440, 2019
212019
A hybrid MIP–CP approach to multistage scheduling problem in continuous casting and hot-rolling processes
Y Tan, MC Zhou, Y Wang, X Guo, L Qi
IEEE Transactions on Automation Science and Engineering 16 (4), 1860-1869, 2019
182019
DELMIA 在某机尾椎装配仿真中的应用
佟立杰, 刘春, 郭希旺
沈阳航空工业学院学报 26 (4), 11-14, 2009
162009
Heuristic scheduling of batch production processes based on petri nets and iterated greedy algorithms
Z Zhao, S Liu, MC Zhou, D You, X Guo
IEEE Transactions on Automation Science and Engineering, 2020
142020
Multiperiod asset allocation considering dynamic loss aversion behavior of investors
J Wang, MC Zhou, X Guo, L Qi
IEEE Transactions on Computational Social Systems 6 (1), 73-81, 2018
122018
Path planning method with improved artificial potential field—A reinforcement learning perspective
Q Yao, Z Zheng, L Qi, H Yuan, X Guo, M Zhao, Z Liu, T Yang
IEEE Access 8, 135513-135523, 2020
112020
Stochastic multi-objective integrated disassembly-reprocessing-reassembly scheduling via fruit fly optimization algorithm
Y Fu, MC Zhou, X Guo, L Qi
Journal of Cleaner Production 278, 123364, 2021
102021
Hybrid scatter search algorithm for optimal and energy-efficient steelmaking-continuous casting
Y Tan, MC Zhou, Y Zhang, X Guo, L Qi, Y Wang
IEEE Transactions on Automation Science and Engineering 17 (4), 1814-1828, 2020
102020
一种典型检测仪的气密检测原理
刘春, 王兴, 李跃中, 郭希旺
液压与气动, 20-25, 2008
102008
求解总拖期时间最小化流水车间调度问题的多智能体进化算法
王大志, 刘士新, 郭希旺
自动化学报 3, 2014
92014
The system can't perform the operation now. Try again later.
Articles 1–20