Follow
Zakwan Hilmy
Zakwan Hilmy
Universitas Karimun
No verified email
Title
Cited by
Cited by
Year
Analisa pengaruh variasi komposisi gas pelindung terhadap hasil pengelasan gmaw-short circuit dengan penggunaan mesin khusus regulated metal deposition (RMD)
Z Hilmy, N Syahroni, YS Hadiwidodo
IPTEK Journal of Proceedings Series, 2018
52018
ANALISA DESKRIPTIF TENTANG SISTEM TENDER PENGADAAN KAPAL LPSE (E-KATALOG) DENGAN SISTEM KONVENSIONAL BERDASARKAN LEGAL FORMAL DI INDONESIA
Z Hilmy
JURNAL JALASENA 1 (2), 66-76, 2020
12020
Metode Dan Proses Fabrikasi Cable Ladder Support Untuk Ruang Akomodasi Pada Drillship “Deep Water Titan” Di Pt. Karimun Sembawang Shipyard
AQ Redha, Z Hilmy, A Dasira
Jurnal Jalasena 1 (1), 35-40, 2019
12019
Comparison Analysis of the Gmaw Pulsed Welding Process on Gmaw Modified Short Circuit in Offshore Piping System
Z Hilmy, H Supomo, A Zubaydi
International Journal of Applied Engineering Research 14 (1), 192-201, 2019
12019
ANALISA TEGANGAN DAN DEFORMASI TERHADAP PENGARUH VARIASI SUDUT KEMIRINGAN V BEVEL PADA PROSES PENGELASAN STAINLESS STEEL BUTT JOINT MENGGUNAKAN METODE ELEMEN HINGGA
Z Hilmy, MZ Prawira, A Dasira, AP Putra
JURNAL MARITIM 4 (1), 53-63, 2022
2022
PEMBAGIAN STARTER KIT KEPADA PEDAGANG UMKM COASTAL AREA TERDAMPAK COVID-19
D Budiman, Z Hilmy, ND Arianti, MK Sitompul
JURNAL AWAM 1 (2), 16-22, 2021
2021
ANALISIS PELAKSANAAN KEGIATAN PENGAWASAN KEDATANGAN KAPAL DI PELABUHAN DOMESTIK OLEH KANTOR KESEHATAN PELABUHAN KELAS II TANJUNG BALAI KARIMUN
ND Arianti, Z Hilmy
JURNAL MARITIM 2 (2), 107-116, 2021
2021
DESIGN DAN ANALISIS LIFTING ARRANGEMENT YANG OPTIMAL UNTUK PENGANGKATAN PROJECT MODUL BERRI BERLOKASI DI PERUSAHAAN SAIPEM TAQA AL-RUSHAID YARD
A Franciska, T Susilo, Z Hilmy
JURNAL JALASENA 2 (1), 28-40, 2020
2020
STUDI KASUS PENERAPAN LOGIKA FUZZY PADA PROSES PEMILIHAN KAPAL BARANG
Z Hilmy, I Abdilla
JURNAL JALASENA 2 (1), 83-97, 2020
2020
METODE ESTIMASI KEBUTUHAN RAW MATERIALS UNTUK PEMBUATAN TOWER GANGWAY PROJECT SHELL VITO DI PT. KARIMUN SEMBAWANG SHIPYARD
Z Hilmy, RI Hutapea
JURNAL JALASENA 1 (1), 41-48, 2019
2019
Analisis Perbandingan Secara Teknis dan Ekonomis Proses Pengelasan GMAW Pulsed Terhadap GMAW Short Circuit Pada Sistem Perpipaan Offshore
Z Hilmy
Institut Teknologi Sepuluh Nopember, 2019
2019
The system can't perform the operation now. Try again later.
Articles 1–11