Determining the optimal inspection rate of circuit breakers equipped with condition monitoring devices using new maintenance Markov model A Karimabadi, ME Hajiabadi, E Kamyab, AA Shojaei International Transactions on Electrical Energy Systems 30 (4), e12272, 2020 | 8 | 2020 |
Prioritization approach for circuit breakers to equip with condition monitoring devices A Karimabadi, ME Hajiabadi, E Kamyab Archives of Electrical Engineering, 403-422-403-422, 2020 | 5 | 2020 |
The Effect of Condition Monitoring of Circuit Breaker on the Reliability and Maintenance Cost of Substation AAS Ali Karimabadi, Mohammad Ebrahim Hajiabadi, Ebadollah Kamyab International Journal of Industrial Electronics, Control and Optimization …, 2019 | 2* | 2019 |
A review of the maintenance and equipment failure of transmission and Super distribution substations EK Ali Karimabadi, Mohammad Ebrahim Hajiabadi Journal of Novel Researches of On Electrical Power 5 (2), 20-31, 2018 | 1* | 2018 |
Integrated Preventive and Predictive Maintenance Markov Model for Circuit Breakers Equipped With Condition Monitoring. A Karimabadi, ME Hajiabadi, E Kamyab, AA Shojaei Iranian Journal of Electrical & Electronic Engineering 16 (2), 2020 | | 2020 |
Combined preventive and predictive maintenance model of power transformers (Case study: Khorasan Regional Electricity Company) A Karimabadi, ME Hajiabadi, E Kamyab, A Shojaei Journal of Modeling in Engineering 17 (56), 421-439, 2019 | | 2019 |
مدل ترکیبی تعمیر و نگهداری پیشگیرانه و پیشبینانه ترانسفورماتور قدرت (مطالعه موردی: شرکت برق منطقه ای خراسان) کریم آبادی, حاجی آبادی, کامیاب, عبادالله, شجاعی مدل سازی در مهندسی 17 (56), 421-439, 2019 | | 2019 |
A Reliability Block Diagram Presentation of Transmission and Super Distribution Circuit Breakers of Khorasan Regional Electric Company MEHAD Khosro Moeeni, Ali Karim Abadi Journal of Novel Researches of On Electrical Power 5 (2), 9-19, 2018 | | 2018 |