Follow
Nani Kurniati
Nani Kurniati
Department of Industrial and Systems Engineering, Institut Teknologi Sepuluh Nopember
Verified email at ie.its.ac.id
Title
Cited by
Cited by
Year
Supply chain management for Disaster Relief Operations: principles and case studies
IN Pujawan, N Kurniati, NA Wessiani
International journal of logistics systems and management 5 (6), 679-692, 2009
542009
Quality inspection and maintenance: the framework of interaction
JJL Nani Kurniati, Ruey-Huei Yeh
Procedia Manufacturing 2015 4, 244-251, 2015
462015
A flexible process-capability-qualified resubmission-allowed acceptance sampling scheme
CW Wu, MH Shu, AA Nugroho, N Kurniati
Computers & Industrial Engineering 80, 62-71, 2015
392015
A sampling scheme for resubmitted lots based on one-sided capability indices
N Kurniati, RH Yeh, CW Wu
Quality Technology & Quantitative Management 12 (4), 501-515, 2015
312015
Designing a variables two-plan sampling system of type TNTVSS-(n T, n N; k) for controlling process fraction nonconforming with unilateral specification limit
N Kurniati, RH Yeh, CW Wu
International Journal of Production Research 53 (7), 2011-2025, 2015
302015
Identifikasi waste dengan metode waste assessment model dalam penerapan lean manufacturing untuk perbaikan proses produksi (studi kasus pada proses produksi sarung tangan)
R Alfiansyah
Institut Teknologi Sepuluh Nopember, 2018
252018
Optimal single replacement policy for products with free-repair warranty under a finite planning horizon
RH Yeh, N Kurniati, WL Chang
Quality Technology & Quantitative Management 12 (2), 159-167, 2015
172015
Mapping risks of Indonesian tuna supply chain
PD Karningsih, D Anggrahini, N Kurniati, M Suef, AR Fachrur, N Syahroni
IOP Conference Series: Materials Science and Engineering 337 (1), 012035, 2018
112018
Analisis Risiko pada Instalasi Pengolahan Air Limbah (IPAL) PT Ajinomoto Berdasarkan Konsep Manajemen Risiko Lingkungan
Y Simamora, N Kurniati
Institut Teknologi Sepuluh Nopember, 2009
92009
A case study on optimal maintenance interval and spare part inventory based on reliability
N Kurniati, RH Yeh
Proceedings of the Institute of Industrial Engineers Asian Conference 2013 …, 2013
72013
Examining equipment condition monitoring for predictive maintenance, a case of typical process industry
RN Riantama, AD Prasanto, N Kurniati, D Anggrahini
Proceedings of the 5th NA International Conference on Industrial Engineering …, 2020
62020
Multi sensor-based failure diagnosis using the mahalanobis taguchi system
BSP Susanto, N Kurniati
IOP Conference Series: Materials Science and Engineering 847 (1), 012036, 2020
62020
Overall equipment effectiveness evaluation of maintenance strategies for rented equipment
A Supriatna, ML Singgih, E Widodo, N Kurniati
International Journal of Technology 11 (3), 619-630, 2020
62020
Determining factors of quality uncertainty and its control analysis in remanufacturing system
MI Mustajib, U Ciptomulyono, N Kurniati
International Journal of Applied Science and Engineering 16 (1), 35-45, 2019
62019
Readiness assessment towards smart manufacturing system for tuna processing industry in Indonesia
D Anggrahini, N Kurniati, PD Karningsih, SM Parenreng, N Syahroni
IOP Conference Series: Materials Science and Engineering 337 (1), 012060, 2018
62018
Pemilihan Supplier Berdasarkan Indeks Kapabilitas dengan Karakteristik Tunggal
EB Prasetyo
Jurnal Manajemen Industri dan Logistik (JMIL) 1 (2), 202-208, 2017
62017
A novel multi-criteria sorting model based on AHP-entropy grey clustering for dealing with uncertain incoming core quality in remanufacturing systems
MI Mustajib, U Ciptomulyono, N Kurniati
Applied Sciences 11 (6), 2731, 2021
42021
Pengaruh Kepercayaan Diri dan Kemampuan Komunikasi Matematika Terhadap Hasil Belajar Matematika Siswa
PSIY Dewi, N Kurniati, W Wahidaturrahmi
Griya Journal of Mathematics Education and Application 1 (2), 122-131, 2021
32021
Program Designing the Improvement of Excavator’s Maintenance Team Competencies (Case Study in a Sandstone Mine Company PT XYZ)
A Aribowo, N Kurniati
IPTEK Journal of Proceedings Series, 16-24, 2019
32019
Policy for equipment’s leasing period extension with minimum cost of maintenance
C Lestari, N Kurniati
IOP Conference Series: Materials Science and Engineering 337 (1), 012068, 2018
32018
The system can't perform the operation now. Try again later.
Articles 1–20