Linear models for stockpiling in open-pit mine production scheduling problems E Moreno, M Rezakhah, A Newman, F Ferreira European Journal of Operational Research 260 (1), 212-221, 2017 | 73 | 2017 |
Artificial neural network and firefly algorithm for estimation and minimization of ground vibration induced by blasting in a mine P Bayat, M Monjezi, M Rezakhah, DJ Armaghani Natural Resources Research 29, 4121-4132, 2020 | 39 | 2020 |
Practical performance of an open pit mine scheduling model considering blending and stockpiling M Rezakhah, E Moreno, A Newman Computers & Operations Research 115, 104638, 2020 | 35 | 2020 |
Open pit mine planning with degradation due to stockpiling M Rezakhah, A Newman Computers & Operations Research 115, 104589, 2020 | 25 | 2020 |
Open pit mine scheduling model considering blending and stockpiling M Rezakhah, E Moreno International Symposium on Mine Planning & Equipment Selection, 75-82, 2019 | 3 | 2019 |
Linear programming approximations for modeling instant-mixing stockpiles E Moreno, F Ferreira, M Goycoolea, D Espinoza, A Newman, M Rezakhah Application of computers and operations research in the mineral industry …, 2015 | 3 | 2015 |
Application of XGB-based metaheuristic techniques for prediction time-to-failure of mining machinery MMK Kazemi, Z Nabavi, M Rezakhah, A Masoudi Systems and Soft Computing 5, 200061, 2023 | 2 | 2023 |
Open pit mine planning with stockpiling M Rezakhah Colorado School of Mines, 2017 | 1 | 2017 |
Design of stable pit slopes of Sungun Copper Mine M Monjezi, M Rezakhah IRANIAN JOURNAL OF MINING ENGINEERING (IRJME) 2 (3), 41-49, 2007 | 1 | 2007 |
New MIP model for short-term planning in open-pit mines considering loading machine performance: a case study in Iran M Mirzehi, M Rezakhah, A Mousavi, Z Nabavi International Journal of Mining and Mineral Engineering 14 (4), 341-364, 2023 | | 2023 |
Design of stable slopes for Songun copper mine M Monjezi, K Goshtasbi, M Rezakhah, TN Singh Mining Technology 116 (3), 146-152, 2007 | | 2007 |
A MATHEMATICAL EQUATION FOR DETERMINATION OF PIT SLOPE OF SONGUN COPPER MINE M MONJEZI, K GOSHTASBI, M REZAKHAH | | 2006 |
DESIGN OF OPTIMUM OVERALL SLOPE OF SONGUN COPPER MINE M MONJEZI, M HEYDARI, M REZAKHAH, A TORABI | | 2005 |