Zuhairi Abd Hamid
Zuhairi Abd Hamid
Executive Director Construction Research Institute of Malaysia
Verified email at cidb.gov.my - Homepage
Title
Cited by
Cited by
Year
Nonlocal boundary value problems for impulsive fractional q k -difference equations
B Ahmad, A Alsaedi, SK Ntouyas, J Tariboon, F Alzahrani
Advances in Difference Equations 2016 (1), 1-16, 2016
3952016
Repair and strengthening of reinforced concrete beam-column joints: State of the art
M Engindeniz, LF Kahn, Z Abdul-Hamid
ACI structural journal 102 (2), 1, 2005
2042005
Exploring the adoption of Building Information Modelling (BIM) in the Malaysian construction industry: A qualitative approach
Z Zahrizan, NM Ali, AT Haron, A Marshall-Ponting, ZA Hamid
International Journal of Research in Engineering and Technology 2 (8), 384-395, 2013
1932013
Ilmu Akhlak
BA Saebani, A Hamid
Bandung: Pustaka Setia, 2010
1862010
Barriers to industrialized building system (IBS): The case of Malaysia
KAM Kamar, M Alshawi, Z Hamid
BuHu 9th international postgraduate research conference (IPGRC), 45-55, 2009
1372009
Behaviour of grouted pipe splice under incremental tensile load
JH Ling, ABA Rahman, IS Ibrahim, ZA Hamid
Construction and Building Materials 33, 90-98, 2012
1232012
Industrialized Building System (IBS) in Malaysia: the current state and R&D initiatives
Z Hamid, KAM Kamar, M Zain, K Ghani, AHA Rahim
Malaysia Construction Research Journal 2 (1), 1-13, 2008
1222008
Industrialized building system (IBS): Revisiting issues of definition and classification
AM Kamar, Z Abd Hamid, NA Azman
International journal of emerging sciences 1 (2), 120, 2011
1202011
POFA: A potential partial cement replacement material in aerated concrete
K Abdullah, MW Hussin, F Zakaria, R Muhamad, Z Abdul Hamid
982006
Exploring the barriers and driving factors in implementing building information modelling (BIM) in the Malaysian construction industry: A preliminary study
Z Zakari, NMA Ali, AT Haron, AM Ponting, ZA Hamid
The Journal of the Institution of Engineers, Malaysia 75 (1), 2014
692014
Sejarah Maritim Indonesia
Abd. Rahman Hamid
Penerbit Ombak, 2013
632013
Ilmu akhlak
B Ahmad, A Hamid
Bandung: Pustaka Setia, 2010
602010
Tensile capacity of grouted splice sleeves
JH Ling, ABA Rahman, IS Ibrahim, ZA Hamid
Engineering Structures 111, 285-296, 2016
542016
Supply chain strategy for contractor in adopting industrialized building system (IBS)
KAM Kamar, ZA Hamid
Australian Journal of Basic and Applied Sciences 5 (12), 2552-2557, 2011
522011
Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems (IBS) in the Malaysian construction industry
KAM Kamar, ZA Hamid, MK Ghani, C Egbu, M Arif
International Journal of Sustainable Construction Engineering and Technology …, 2010
512010
Improving integrated practice through building information modeling-integrated project delivery (BIM-IPD) for Malaysian industrialised building system (IBS) Construction Projects
MN Mohd Nawi, AT Haron, Z Abd Hamid, KA Mohamad Kamar, ...
Malaysian Construction Research Journal 15 (2), 1-15, 2014
482014
Ihya’ulum al-din.(terj.)
AH Al-Ghazali, M bin Ahmad
Jakarta: Menara Kudus, 1980
481980
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
MNM Nawi, A Lee, KAM Kamar, ZA Hamid
Malaysian Construction Research Journal 10 (1), 45-63, 2012
452012
Industrialised building system: the critical success factors
KAM Kamar, M Alshawi, Z Hamid
9th International Postgraduate Research Conference (IPGRC), 29-30, 2009
442009
Aspects of off‐site manufacturing application towards sustainable construction in Malaysia
ZA Hamid, KAM Kamar
Construction Innovation, 2012
422012
The system can't perform the operation now. Try again later.
Articles 1–20