Follow
Zuhairi Abd Hamid
Zuhairi Abd Hamid
Executive Director Construction Research Institute of Malaysia
Verified email at cidb.gov.my - Homepage
Title
Cited by
Cited by
Year
Ilmu akhlak
BA Saebani, A Hamid
Pustaka Setia, 2017
3612017
Exploring the adoption of Building Information Modelling (BIM) in the Malaysian construction industry: A qualitative approach
Z Zahrizan, NM Ali, AT Haron, A Marshall-Ponting, ZA Hamid
International journal of research in engineering and technology 2 (8), 384-395, 2013
2942013
Behaviour of grouted pipe splice under incremental tensile load
JH Ling, ABA Rahman, IS Ibrahim, ZA Hamid
Construction and Building Materials 33, 90-98, 2012
2192012
Barriers to industrialized building system (IBS): The case of Malaysia
KAM Kamar, M Alshawi, Z Hamid
Proceedings of the BuHu 9th international postgraduate research conference …, 2009
1962009
Industrialized building system (IBS): Revisiting issues of definition and classification
AM Kamar, Z Abd Hamid, NA Azman
International journal of emerging sciences 1 (2), 120, 2011
1782011
Industrialized Building System (IBS) in Malaysia: the current state and R&D initiatives
Z Hamid, KAM Kamar, M Zain, K Ghani, AHA Rahim
Malaysia construction research journal 2 (1), 1-13, 2008
1522008
Tensile capacity of grouted splice sleeves
JH Ling, ABA Rahman, IS Ibrahim, ZA Hamid
Engineering Structures 111, 285-296, 2016
1412016
POFA: A potential partial cement replacement material in aerated concrete
K Abdullah, MW Hussin, F Zakaria, R Muhamad, Z Abdul Hamid
1152006
Exploring the barriers and driving factors in implementing building information modelling (BIM) in the Malaysian construction industry: A preliminary study
Z Zakari, NMA Ali, AT Haron, AM Ponting, ZA Hamid
The Journal of The Institution of Engineers Malaysia 75 (1), 2014
1082014
Ilmu Akhlak
B Ahmad, A Hamid
Bandung: Pustaka Setia, 2010
1082010
Pemikiran Modern Dalam Islam
A Hamid, Yaya, MA Djaliel, BA Saebani
Pustaka Setia, 2010
782010
Improving integrated practice through building information modeling-integrated project delivery (BIM-IPD) for Malaysian industrialised building system (IBS) Construction Projects
MNM Nawi, AT Haron, ZA Hamid, KAM Kamar, Y Baharuddin
Malaysian Construction Research Journal Volume 15, Issue 2, 1 December 2014 …, 2014
742014
Supply chain strategy for contractor in adopting industrialised building system (IBS)
KAM Kamar, ZA Hamid
Australian Journal of Basic and Applied Sciences 5 (12), 2552-57, 2011
692011
The adoption of Industrialised Building System (IBS) construction in Malaysia: The history, policies, experiences and lesson learned
MI Din, N Bahri, MA Dzulkifly, MR Norman, KAM Kamar, Z Abd Hamid
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2012
682012
Aspects of off-site manufacturing application towards sustainable construction in Malaysia
ZA Hamid, KAM Kamar
Construction Innovation 12 (1), 4-10, 2012
632012
Collaboration initiative on green construction and sustainability through Industrialized Buildings Systems (IBS) in the Malaysian construction industry
KAM Kamar, ZA Hamid, MK Ghani, C Egbu, M Arif
International Journal of Sustainable Construction Engineering and Technology …, 2010
632010
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
MNM Nawi, A Lee, KAM Kamar, ZA Hamid
Malaysian Construction Research Journal 10 (1), 45-63, 2012
602012
Sustainable construction and green building: the case of Malaysia
KAM Kamar, ZA Hamid
Sustainability Today, WIT Transactions on Ecology and The Environment 167, 15-22, 2012
572012
Towards a national green building rating system for Malaysia
ZA Hamid, AF Roslan, MC Ali, FC Hung, MSM Noor, NM Kilau
Malaysian Construction Research Journal 14 (1), 1-16, 2014
522014
Industrialised building system: the critical success factors
KAM Kamar, M Alshawi, Z Hamid
9th International Postgraduate Research Conference (IPGRC), University of …, 2009
522009
The system can't perform the operation now. Try again later.
Articles 1–20