Xiangyu Wang
Xiangyu Wang
Curtin-Woodside Chair Professor, Curtin University
No verified email
Title
Cited by
Cited by
Year
A theoretical framework of a BIM-based multi-disciplinary collaboration platform
V Singh, N Gu, X Wang
Automation in construction 20 (2), 134-144, 2011
4922011
Research Trend and Opportunities of Augmented Reality Applications in Architecture, Engineering and Construction
HL Chi, S Kang, X Wang
Automation in Construction 33, 116-122, 2013
3032013
A Critical Review of the Use of 3D Printing in the Construction Industry
P Wu, J Wang, X Wang
Automation in Construction 68, 21-31, 2016
2762016
A Framework for Proactive Construction Defect Management using BIM, Augmented Reality and Ontology-based Data Collection Template
C Park, D Lee, O Kwon, X Wang
Automation in Construction 33, 61-71, 2013
2382013
Augmented Reality in built environment: Classification and implications for future research
X Wang, MJ Kim, PED Love, SC Kang
Automation in construction 32, 1-13, 2013
2072013
A conceptual framework for integrating building information modeling with augmented reality
X Wang, PED Love, MJ Kim, CS Park, CP Sing, L Hou
Automation in construction 34, 37-44, 2013
1752013
Engagement of facilities management in design stage through BIM: framework and a case study
Y Wang, X Wang, J Wang, P Yung, G Jun
Advances in Civil Engineering 2013, 2013
1752013
Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry
X Wang, M Truijens, L Hou, Y Wang, Y Zhou
Automation in Construction 40, 96-105, 2014
1502014
A Critical Review of Virtual and Augmented Reality (VR/AR) Applications in Construction Safety
X Li, W Yi, HL Chi, X Wang, APC Chan
Automation in Construction 86, 150-162, 2018
1482018
A Mixed Review of the Adoption of Building Information Modelling (BIM) for Sustainability
CY Lee, H Chong, X Wang
Journal of Cleaner Production 142, 4114–4126, 2017
1332017
Determining the probability of project cost overruns
PED Love, X Wang, C Sing, RLK Tiong
Journal of Construction Engineering and Management 139 (3), 321-330, 2013
1302013
Construction and demolition waste management in China through the 3R principle
B Huang, X Wang, H Kua, Y Geng, R Bleischwitz, J Ren
Resources, Conservation and Recycling 129, 36-44, 2018
1092018
Using animated augmented reality to cognitively guide assembly
L Hou, X Wang, L Bernold, PED Love
Journal of Computing in Civil Engineering 27 (5), 439-451, 2013
1092013
Compatibility issues in Augmented Reality systems for AEC: An experimental prototype study
X Wang, PS Dunston
Automation in construction 15 (3), 314-326, 2006
1052006
A comparative review of building information modelling implementation in building and infrastructure industries
W Shou, J Wang, X Wang, HY Chong
Archives of Computational Methods in Engineering 22 (2), 291-308, 2015
1042015
Mixed reality benefits for design perception
P Dunston, X Wang, M Billinghurst, B Hampson
Nist Special Publication SP, 191-196, 2003
1022003
A review of methods and algorithms for optimizing construction scheduling
J Zhou, PED Love, X Wang, KL Teo, Z Irani
Journal of the Operational Research Society 64 (8), 1091-1105, 2013
992013
Design, strategies, and issues towards an augmented reality-based construction training platform
X Wang, PS Dunston
Journal of Information Technology in Construction 12, 363-380, 2007
962007
A State-of-the-Art Review on the Integration of Building Information Modelling (BIM) and Geographic Information System (GIS)
X Liu, X Wang, G Wright, JCP Cheng, X Li, R Liu
International Journal of Geo-Information 6 (2), 53. doi:http://dx.doi.org/10 …, 2017
952017
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
X Li, P Wu, GQ Shen, X Wang, Y Teng
Automation in Construction 84, 195-206, 2017
872017
The system can't perform the operation now. Try again later.
Articles 1–20