Follow
Ahmad Rizal Alias
Title
Cited by
Cited by
Year
Factors affecting workplace well-being: building construction projects
HA Rani, AR Radzi, AR Alias, S Almutairi, RA Rahman
Buildings 12 (7), 910, 2022
202022
An overview of total Quality management (TQM) practice in construction sector
AJ Likita, NY Zainun, IA Rahman, ASMA Awal, AR Alias, MQA Rahman, ...
IOP Conference Series: Earth and Environmental Science 140 (1), 012115, 2018
182018
Comparison between ARIMA and DES methods of forecasting population for housing demand in Johor
AR Alias, NY Zainun, IA Rahman
MATEC Web of Conferences 81, 07002, 2016
152016
Indoor air quality (IAQ) and related risk factors for sick building syndrome (SBS) at the office and home: a systematic review
N Aziz, MA Adman, NS Suhaimi, S Misbari, AR Alias, A Abd Aziz, LF Lee, ...
IOP Conference Series: Earth and Environmental Science 1140 (1), 012007, 2023
92023
Baseline for food waste generation–A case study in Universiti Tun Hussein Onn Malaysia cafeterias
AR Alias, NAM Mokhlis, NY Zainun
IOP Conference Series: Materials Science and Engineering 271 (1), 012045, 2017
82017
Factors Affecting Workplace Well-Being: Building Construction Projects. Buildings 2022, 12, 910
HA Rani, AR Radzi, AR Alias, S Almutairi, RA Rahman
s Note: MDPI stays neutral with regard to jurisdictional claims in published …, 2022
22022
Headship rate projections for housing demand in Johor, Malaysia
AR Alias, NY Zainun, IA Rahman, A Suratkon, N Sulaiman, FEM Ghazali, ...
Journal of Physics: Conference Series 1019 (1), 012005, 2018
22018
Significant factors of key parameters for low medium cost housing demand in Malaysia
NY Zainun, MSA Rahman, AR Alias, FEM Ghazali
Engineering Heritage Journal 1 (1), 25-28, 2017
22017
Development of workplace well-being indexes at construction sites
MM Omer, T Moyo, AR Alias, RA Rahman
Journal of Engineering, Design and Technology, 2024
12024
Modeling the construction readiness parameters for abandoned housing projects in Malaysia: PLS-SEM approach
NA Abdul-Rahman, RA Rahman, AR Alias
Open House International, 2024
12024
Reviving abandoned construction projects: Difficulties and countermeasures
F Yusoff, AR Alias, RA Rahman
AIP Conference Proceedings 2688 (1), 2023
12023
Decision criteria for assessing construction readiness of abandoned projects
NA Abdul-Rahman, RA Rahman, AR Alias
AIP Conference Proceedings 2688 (1), 2023
12023
Decomposing Process of Food Waste using Black Soldier Fly Larvae (BSFL): Case Study in Taman Pura Kencana, Johor
USM Tahir, NY Zainun, H Ahmad, SH Khahro, AR Alias
International Journal of Sustainable Construction Engineering and Technology …, 2022
12022
Significant Parameters of Affordability House Buyers In Batu Pahat, Johor, Malaysia
NF Shafawi, NY Zainun, SK Yaman, AR Alias, NA Arish, MQA Rahman, ...
Journal of Applied Geoscience and Built Environment 1 (2), 2019
12019
Headship Rate for Population Projection in Johor Bahru
NM Rawan, NY Zainun, AR Alias, IS Ibrahim
MATEC Web of Conferences 87, 01023, 2017
12017
Modeling the factors affecting workplace well-being at construction sites: a cross-regional multigroup analysis
AR Radzi, A KS, AR Alias, M Algahtany, RA Rahman
Journal of Engineering, Design and Technology, 2024
2024
Validating The Impact of Psychological, Physical, and Social Factors On Workplace Well-Being at Construction Sites
AR Radzi, RA Rahman, AR Alias, S Almutairi
International Journal of Integrated Engineering 15 (2), 245-255, 2023
2023
Well-being in high-rise construction sites: key factors
SA Halim, AR Radzi, AR Alias, RA Rahman
IET Digital Library, 2022
2022
STRATEGIES FOR MEASURING PROGRESS AND PRODUCTIVITY IN MODEL BASED CONSTRUCTION PROJECTS
AR Alias, AA Adzman, RA Rahman
2021
The system can't perform the operation now. Try again later.
Articles 1–19