Follow
WISNU ISVARA
WISNU ISVARA
Verified email at staff.ui.ac.id
Title
Cited by
Cited by
Year
Preliminary cost estimation using regression analysis incorporated with adaptive neuro fuzzy inference system
Y Latief, A Wibowo, W Isvara
International Journal of Technology 1, 63-72, 2013
162013
Strategies to increase procurement maturity level using procurement maturity model to improve procurement performance
D Aulia, W Isvara
International Journal of Scientific and Research Publications (IJSRP) 11 (6), 2021
82021
Identification of roof truss work activities for the Jakarta international stadium project with heavy lifting construction method using strand jack system
PA Sejati, W Isvara, Y Latief
AIP Conference Proceedings 2706 (1), 2023
12023
Development of a risk-based strategy implementation of a full pre-financed contractor scheme (CPF) in toll road projects to improve time performance
M Ichsan, W Isvara, JN Handibyanto, FA Muhammad
Cogent Engineering 11 (1), 2307212, 2024
2024
Risk identification and response for deep foundation works: Bored pile and secant pile
YPB Bayuadi, LS Riantini, W Isvara
AIP Conference Proceedings 2838 (1), 2024
2024
Strategy development of contractor with Contractor Full Pre-Finance (CPF) scheme using risk-based approach to increase cost performance of toll road development projects
W Isvara, M Ichsan, FA Muhammad, JN Handibyanto, SB Abdinagoro
Cogent Engineering 10 (1), 2243718, 2023
2023
The Implementation of Building Information Modelling for Cut and Fill Quantity Takeoff in Toll Road Project
A Fahmilia, W Isvara
Jurnal Indonesia Sosial Sains 4 (08), 728-738, 2023
2023
Evaluation analysis of precast house facade panel production time on housing projects in Indonesia
W Isvara
english, 2023
2023
Evaluation analysis of precast house facade panel production time on housing projects in Indonesia
W Pambudi, W Isvara, M Ichsan
AIP Conference Proceedings 2706 (1), 2023
2023
Risk Factors Identification of Office Building Construction Project in BPJS Ketenagakerjaan to Improve Time Performance
W Isvara
International Journal of Scientific and Research Publications 12 (12), 383-390, 2022
2022
Feasibility Study Analysis of Hybrid Power Plant: Case Studies of Biomass and Solar PV at Bangka Island
W Isvara
International Journal of Scientific and Research Publications 12 (12), 212-218, 2022
2022
The Importance of Procurement Organization, Policy, and Value on Supply Chain Performance
D Aulia, W Isvara
Proceedings of the 2022 5th International Conference on Computers in …, 2022
2022
Factors Affecting Operation and Maintenance Cost Contingency of Distribution Gas Pipeline in Indonesia
W Isvara
International Journal of Scientific and Research Publications, 88-94, 2021
2021
The Implementation of INVI-J to Ensure the Sustainability of Bridge Infrastructure in Indonesia
F Ramadhan, LS Riantini, W Isvara
Proceedings of the 3rd Asia Pacific Conference on Research in Industrial and …, 2020
2020
Factor Analysis of Construction Productivity and Developer’s Sales at Bekasi Regency Subsidized Housing
I Yanastyapricena, AD Rarasati, W Isvara, RN Ilma
2020
Qualitative Risk Analysis of Production Precast Spun Pile at Company-X
RE Putra, W Isvara
Browse Article
Y Latief, MA Berawi, AD Rarasati, LS Supriadi, ARB Berawi, ...
Schedule Risk Assessment in High-Rise Building Construction Projects with Joint Operation Scheme by Foreign Contractor in Indonesia
M Rizka, W Isvara
The system can't perform the operation now. Try again later.
Articles 1–18