A parametric cost model for mineral grinding mills AR Sayadi, MR Khalesi, MK Borji Minerals Engineering 55, 96-102, 2014 | 809 | 2014 |
Estimating capital and operational costs of backhoe shovels AR Sayadi, A Lashgari, MM Fouladgar, MJ Skibniewski Journal of Civil Engineering and Management 18 (3), 378-385, 2012 | 419 | 2012 |
A comparative study on the application of various artificial neural networks to simultaneous prediction of rock fragmentation and backbreak A Sayadi, M Monjezi, N Talebi, M Khandelwal Journal of Rock Mechanics and Geotechnical Engineering 5 (4), 318-324, 2013 | 144 | 2013 |
مجردة M Monjezi, A Bahrami, AY Varjani, AR Sayadi Arabian Journal of Geosciences 4, 421-425, 2011 | 118 | 2011 |
Application of TOPSIS method for selecting the most appropriate blast design M Monjezi, H Dehghani, TN Singh, AR Sayadi, A Gholinejad Arabian journal of geosciences 5 (1), 95, 2012 | 91 | 2012 |
Comparison of serum lead level in oral opium addicts with healthy control group H Salehi, AR Sayadi, M Tashakori, R Yazdandoost, N Soltanpoor, ... Arch Iran Med 12 (6), 555-8, 2009 | 64 | 2009 |
Optimizing post-mining land use for pit area in open-pit mining using fuzzy decision making method AH Bangian, M Ataei, A Sayadi, A Gholinejad International Journal of Environmental Science and Technology 9, 613-628, 2012 | 55 | 2012 |
Hard-rock LHD cost estimation using single and multiple regressions based on principal component analysis AR Sayadi, A Lashgari, JJ Paraszczak Tunnelling and underground space technology 27 (1), 133-141, 2012 | 54 | 2012 |
Application of neural networks to predict net present value in mining projects AR Sayadi, SMM Tavassoli, M Monjezi, M Rezaei Arabian Journal of Geosciences 7, 1067-1072, 2014 | 42 | 2014 |
Evaluation of effect of rock mass properties on fragmentation using robust techniques A Mehrdanesh, M Monjezi, AR Sayadi Engineering with Computers 34, 253-260, 2018 | 35 | 2018 |
Statistical approach to determination of overhaul and maintenance cost of loading equipment in surface mining A Lashgari, AR Sayadi International Journal of Mining Science and Technology 23 (3), 441-446, 2013 | 31 | 2013 |
Open pit optimization in 3D using a new artificial neural network AR Sayadi, N Fathianpour, AA Mousavi Archives of Mining Sciences 56 (3), 389-403, 2011 | 26 | 2011 |
An integrated GIS-based approach for geohazards risk assessment in coal mines V Vaziri, J Khademi Hamidi, AR Sayadi Environmental earth sciences 77, 1-18, 2018 | 25 | 2018 |
Reliability analysis of motor system of dump truck for maintenance management Z Allahkarami, AR Sayadi, A Lanke Current Trends in Reliability, Availability, Maintainability and Safety: An …, 2016 | 24 | 2016 |
Development of a techno-economic simulation tool for an improved mineral processing plant design MR Khalesi, MJ Zarei, AR Sayadi, F Khoshnam, MH Chegeni Minerals Engineering 81, 103-108, 2015 | 18 | 2015 |
Fuzzy analytical hierarchy processing to define optimum post mining land use for pit area to clarify reclamation costs AH Bangian, M Ataei, A Sayadi, A Gholinejad Gospodarka Surowcami Mineralnymi-Mineral Resources Management, 145-168-145-168, 2011 | 17 | 2011 |
Blasting operation management using mathematical methods M Yari, M Monjezi, R Bagherpour, AR Sayadi Engineering Geology for Society and Territory-Volume 1: Climate Change and …, 2015 | 12 | 2015 |
Productivity Improvement in a Steel Industry using Supply Chain Management Technique MR Soltani, AR Sayadi, M Monjezi, M Hayati International Journal of Mining and Geo-Engineering 47 (1), 51-59, 2013 | 12 | 2013 |
Improved mine waste dump planning through integration of geochemical and mineralogical data and mixed integer programming: Reducing acid rock generation from mine waste V Vaziri, AR Sayadi, A Parbhakar-Fox, A Mousavi, M Monjezi Journal of Environmental Management 309, 114712, 2022 | 11 | 2022 |
Risk management in tunnel Construction using MADM techniques A Sayadi, M Hayati, M Monjezi Industrial Management Journal 3 (2), 99-116, 2011 | 11 | 2011 |