Follow
Monty Sutrisna
Monty Sutrisna
Professor of Construction & Project Management, Head of School of Built Environment, Massey
Verified email at massey.ac.nz
Title
Cited by
Cited by
Year
Trends and opportunities of BIM-GIS integration in the architecture, engineering and construction industry: A review from a spatio-temporal statistical perspective
Y Song, X Wang, Y Tan, P Wu, M Sutrisna, JCP Cheng, K Hampson
ISPRS International Journal of Geo-Information 6 (12), 397, 2017
2372017
Research Methodology in Doctoral Research: Understanding the Meaning of Conducting Qualitative Research
M Sutrisna
http://www.arcom.ac.uk/-docs/workshops/2009-Liverpool.pdf, 2009
2092009
Public-private partnerships: A review of theory and practice of performance measurement
J Liu, P ED Love, J Smith, M Regan, M Sutrisna
International Journal of Productivity and Performance Management 63 (4), 499-512, 2014
1592014
A comprehensive analysis of the credits obtained by LEED 2009 certified green buildings
P Wu, Y Song, W Shou, H Chi, HY Chong, M Sutrisna
Renewable and Sustainable Energy Reviews 68, 370-379, 2017
1502017
Construction waste management in India: an exploratory study
M Arif, D Bendi, T Toma‐Sabbagh, M Sutrisna
Construction innovation 12 (2), 133-155, 2012
1442012
Cyber-physical systems integration of building information models and the physical construction
A Akanmu, CJ Anumba
Engineering, Construction and Architectural Management, 2015
1332015
Preliminary contractual framework for BIM-enabled projects
HY Chong, SL Fan, M Sutrisna, SH Hsieh, CM Tsai
ASCE Journal of Construction Engineering and Management 143 (7), 04017025, 2017
952017
Applying rich picture diagrams to model case studies of construction projects
M Sutrisna, P Barrett
Engineering, Construction and Architectural Management 14 (2), 164-179, 2007
912007
Methodological strategies to gain insights into informality and emergence in construction project case studies
P Barrett, M Sutrisna
Construction management and economics 27 (10), 935-948, 2009
902009
Managing information flow and design processes to reduce design risks in offsite construction projects
M Sutrisna, J Goulding
Engineering, construction and architectural management 26 (2), 267-284, 2019
862019
Facilitating Digital Transformation in Constructions —A Systematic Review of the Current State of the Art
AO Olanipekun, M Sutrisna
Frontiers in Built Environment 7, 660758, 2021
602021
Impacts of value engineering on five Capital Arts projects
C Alan Short, P Barrett, A Dye, M Sutrisna
Building Research & Information 35 (3), 287-315, 2007
562007
An ontology-based web service framework for construction supply chain collaboration and management
M Das, JCP Cheng, KH Law
Engineering, Construction and Architectural Management, 2015
542015
Decision-making model for selecting the optimum method of delay analysis in construction projects
NA Perera, M Sutrisna, TW Yiu
ASCE Journal of Management in Engineering 32 (5), 04016009, 2016
512016
Enabling an effective knowledge and information flow between the phases of building construction and facilities management
AZT Tan, A Zaman, M Sutrisna
Facilities 36 (3/4), 151-170, 2018
502018
Developing work breakdown structure matrix for managing offsite construction projects
M Sutrisna, CDD Ramanayaka, JS Goulding
Architectural Engineering and Design Management 14 (5), 381-397, 2018
442018
Development of a client-based risk management methodology for the early design stage of construction processes
A Albogamy, N Dawood
Engineering, Construction and Architectural Management, 2015
422015
The use of analytic hierarchy process (AHP) in the analysis of delay claim in construction projects in the UAE
N Perera, M Sutrisna
The Built and Human Environment Review 3 (1), 29-48, 2010
412010
Developing a knowledge based system for the valuation of variations on civil engineering works
M Sutrisna
University of Wolverhampton, 2004
382004
Modelling knowledge integration process in early contractor involvement procurement at tender stage–a Western Australian case study
J Hastie, M Sutrisna, C Egbu
Construction Innovation 17 (4), 429-456, 2017
362017
The system can't perform the operation now. Try again later.
Articles 1–20