Penentuan Interval Waktu Perawatan Komponen Kritis pada Mesin Turbin di PT PLN (Persero) Sektor Pembangkit Ombilin T Taufik, S Septyani Jurnal Optimasi Sistem Industri 14 (2), 2015 | 41 | 2015 |
Minimizing economic and environmental impacts through an optimal preventive replacement schedule: Model and application F Afrinaldi, TTAM Tasman, HC Zhang, A Hasan Journal of Cleaner Production 143, 882-893, 2017 | 38 | 2017 |
The Advantages of Remanufacturing from the Perspective of Eco-efficiency Analysis: A Case Study F Afrinaldi, Z Liu, T Taufik, HC Zhang, A Hasan 24th CIRP Conference on Life Cycle Engineering 61, 223-228, 2017 | 18 | 2017 |
Perancangan Aplikasi Sistem Penilaian Kinerja Karyawan dengan metode MBO dan BARS (Studi Kasus PLTA Maninjau) T Taufik, P Fithri, YE Prathama Jurnal Optimasi Sistem Industri 13 (2), 2014 | 10 | 2014 |
Evaluasi Kinerja Pemeliharaan PLTA dengan Pendekatan Maintenance Scorecard dan Objective Matrix (OMAX) (Studi Kasus Unit Pembangkit Listrik Tenaga Air Maninjau) T Taufik, A Afrizal Jurnal Optimasi Sistem Industri 13 (1), 2014 | 7 | 2014 |
Keandalan Sistem Lintasan Produksi Pembuatan Pipa T Taufik, W Hidayanti Jurnal Optimasi Sistem Industri 15 (2), 2016 | 4 | 2016 |
Perancangan Prototype Early Warning System pada Kontrol On/Off Belt Conveyor Menggunakan PLC Siemens S7-300 T Taufik, W Putri Jurnal Optimasi Sistem Industri 14 (1), 2015 | 4 | 2015 |
Integrasi Frame Work Risk and Insurance Management Society (RIMS) dalam Analisis Kematangan Implementasi Manajemen Risiko (Studi Kasus: PLTA Maninjau) T Taufik, A Fauzan Jurnal Optimasi Sistem Industri 12 (2), 2013 | 1 | 2013 |