Follow
Asmalia, Che Ahmad
Asmalia, Che Ahmad
Doctorate in Industrial Safety Management
Verified email at perak.uitm.edu.my
Title
Cited by
Cited by
Year
Hazard identification, risk assessment and risk control (HIRARC) accidents at power plant
AC Ahmad, INM Zin, MK Othman, NH Muhamad
MATEC Web of Conferences 66, 00105, 2016
792016
The construction solid waste minimization practices among Malaysian contractors
AC Ahmad, NI Husin, H Zainol, AHA Tharim, NA Ismail, AM Ab Wahid
MATEC web of conferences 15, 01037, 2014
202014
Satisfaction analysis of flood victims towards housing relocation scheme during post occupancy at Kuala Krai, Kelantan
AHA Tharim, AC Ahmad, MHM Saraf, NAM Nasir
PLANNING MALAYSIA 19, 2021
42021
ASSOCIATION BETWEEN THERMAL COMFORT CONDITION AND WORSHIPPERS’SATISFACTION IN TIMBER AND CONCRETE OF SUBURBAN RELIGIOUS BUILDINGS.
FF ABDUL MUNIR, AH ABDUL THARIM, A CHE AHMAD, NA ISMAIL, ...
Geographia Technica 15, 2020
42020
Prevention and control actions of covid-19 crisis at construction sites in Malaysia
NAA Musa, AC Ahmad, AHA Tharim, RM Salleh, PSN Saarani
Malaysian Journal of Sustainable Environment 9 (3), 143-161, 2022
22022
A Systematic Literature Review (SLR) on the strategies of managing waste in relative to Green Building (GB) practice
PSN Saarani, AH Abdul Tharim, A Che Ahmad, R Mohamed Salleh
Pertanika J. Sci. Technol 30, 1363-1380, 2022
22022
Overview of safety & health cost framework for the construction of rail infrastructure projects
IFM Kamar, AC Ahmad, MM Derus
Malaysian Journal of Sustainable Environment 2 (1), 101-120, 2017
22017
Stormwater as a Criterion for Green Highway.
A Che Ahmad, NI Husin, AM Ab Wahid, SN Kamaruzzaman
Pertanika Journal of Social Sciences & Humanities, 2017
12017
Tropical Environment Elements for Green Highway Assessment
AC Ahmad, NI Husin, AM Ab Wahid, SN Kamaruzzaman
Social and Management Research Journal 13 (2), 97-112, 2016
12016
Workers’ Safety During Construction: Investigating the integration of safety features into design process in Malaysia construction industry
N Yusop, F Md Dahlan, A Che Ahmad
12012
Gap analysis on accident causation and implementation of Integrated Management System (IMS) at construction site
A Che Leh, A Che Ahmad, AQ Abdul Karim
Virtual Go-Green: Conference and Publication (V-Go Green 2020), 106-111, 2021
2021
Rainwater harvesting system for academic building. Is it worth it?/Azirah Adnan, Asmalia Che Ahmad and Suharto Teriman
A Azirah, A Che Ahmad, S Teriman
Virtual Go-Green: Conference and Publication (V-Go Green 2020), 330-338, 2021
2021
Association between biophilic home office setting and academicians’ perceived performance by using SMARTPLS
MH Mohamed Saraf, NN Ahmad, AH Abdul Tharim, A Che Ahmad, ...
Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 444-449, 2021
2021
An analysis on the association between thermal comfort and visitors’ satisfaction in shopping complexes using SEM-PLS
AH Abdul Tharim, NN Ahmad, MH Mohamed Saraf, A Che Ahmad, ...
Virtual Go-Green: Conference and Publication (V-Go Green 2020), 324-329, 2021
2021
An analysis of Personal Protective Equipment (PPE) costs incurred by the contractors of MRT Projects
IF Mohd Kamar, MHP Umari, NS Lop, A Che Ahmad
Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 139-144, 2021
2021
Design parameters for installing Rainwater Harvesting System (RWHS) for mosques: a systematic literature review analysis
KN Mat Daud, A Che Ahmad, AF Hassan Naziri, A Zainonabidin
Virtual Go-Green: Conference and Publication (V Go-Green 2020) Universiti …, 2021
2021
An introduction to research@ UiTM Perak version 1.0
A Che Ahmad, NH Ibrahim, AH Abdul Tharim, MQAN Ahmad Radzi, ...
International Innovation, Invention & Design Competition, 49-51, 2020
2020
Risk analysis on hazard in high-rise construction project in Pulau Pinang
MF Abdul Fatah, A Che Ahmad
2020
The significance of components of centralised labour quarter (CLQ) standard for workers’ housing and amenities/Muhamad Afiq bin Zully Romzi and Asmalia Che Ahmad
MA Zully Romzi, A Che Ahmad
2019
A systematic review on Rainwater Harvesting (RWH) installation system for non-potable use
A Adnan, A Che Ahmad, S Teriman
2018
The system can't perform the operation now. Try again later.
Articles 1–20