Probabilistic prediction of tunnel geology using a Hybrid Neural-HMM SS Leu, TJW Adi Engineering Applications of Artificial Intelligence 24 (4), 658-665, 2011 | 56 | 2011 |
Optimasi (Unequal) Site Layout Menggunakan Multi-Objectives Function Pada Proyek Pembangunan Apartemen Puncak Kertajaya Surabaya DT Effendi, TJW Adi, YE Putri Jurusan Teknik Sipil. Institut Teknologi Sepuluh Nopember, 2012 | 21 | 2012 |
Low-cost apartment program implementation in Surabaya metropolitan area F Rachmawati, RAA Soemitro, TJW Adi, C Susilawati Procedia Engineering 125, 75-82, 2015 | 18 | 2015 |
Faktor-faktor Penyebab Keterlambatan Waktu Pembangunan Proyek Gedung Negara di Lingkungan Pemerintah Kota Kediri S Wijayanthi Institut Teknologi Sepuluh November. Surabaya, 2008 | 17 | 2008 |
Adoption and implementation of building information modeling (BIM) by the government in the Indonesian construction industry MP Sopaheluwakan, TJW Adi IOP Conference Series: Materials Science and Engineering 930 (1), 012020, 2020 | 16 | 2020 |
Application of circular economy in the Indonesia construction industry TJW Adi, P Wibowo IOP Conference Series: Materials Science and Engineering 849 (1), 012049, 2020 | 16 | 2020 |
Critical success factor for partnership in low-cost apartments project: Indonesia perspective F Rachmawati, RAA Soemitro, TJW Adi, C Susilawati Pacific Rim Property Research Journal 24 (2), 149-160, 2018 | 14 | 2018 |
Public tendering process for construction projects: problem identifications, analysis, and proposed solutions EI Kusumarukmi, TJW Adi MATEC Web of Conferences 258, 02013, 2019 | 13 | 2019 |
Bridge deterioration prediction model based on hybrid Markov-system dynamic JW Soetjipto, TJW Adi The 6th International Conference of Euro Asia Civil Engineering Forum 138 …, 2017 | 13 | 2017 |
Microtunneling decision support system (MDS) using neural-autoregressive hidden markov model SS Leu, TJW Adi Expert Systems with Applications 38 (5), 5801-5808, 2011 | 13 | 2011 |
Optimasi (equal) site layout menggunakan multi-objectives function pada Proyek A D Pranarka, TJW Adi Jurnal Teknik ITS 1 (1), D72-D75, 2012 | 12 | 2012 |
Evaluasi kinerja aset tempat pengolahan sampah terpadu (TPST) di Kabupaten Sidoarjo M Marlena, TJW Adi, I Warmadewanthi Jurnal Manajemen Aset Infrastruktur & Fasilitas 4 (3), 2020 | 11 | 2020 |
Model prediksi kelelahan pekerja konstruksi di lokasi proyek LAR Winanda, TW Adi, N Anwar A SCIENTIFIC JOURNAL OF CIVIL ENGINEERING 21 (2), 99-109, 2017 | 11 | 2017 |
Analisa Perbandingan Metode Erection Girder Menggunakan Launcher Girder Dan Temporary Bridge Dari Segi Biaya Dan Waktu Pada Jembatan Kali Surabaya Mojokerto DD Pratama, TJW Adi Jurnal Teknik Pomits 1 (1), 1-10, 2013 | 11 | 2013 |
A design concept of fuzzy decision support system for construction workers safety monitoring LAR Winanda, A Arifin, F Arrofiqi, TW Adi, N Anwar MATEC web of conferences 258, 02019, 2019 | 10 | 2019 |
System dynamics approach for bridge deterioration monitoring system JW Soetjipto International Journal of Engineering and Technology Innovation 6 (4), 264-273, 2016 | 10 | 2016 |
Analysis The Effect of Total Quality Management, Technology, and Knowledge Management on Product Quality in Indonesia Construction Industry MY Latansa, TJW Adi, MA Rohman IPTEK Journal of Proceedings Series, 527-535, 2019 | 9 | 2019 |
The cultural differences influences on knowledge sharing activities in construction project collaboration TJW Adi, A Musbah IPTEK Journal of Proceedings Series 3 (1), 85-89, 2017 | 9 | 2017 |
A dynamic model for assessing the effects of construction worker waste behavior to reduce material waste H Suciati, TJW Adi, IPA Wiguna Int. J. Adv. Sci. Eng. Inf. Technol 8 (2), 444-452, 2018 | 8 | 2018 |
Construction worker fatigue prediction model based on system dynamic TJW Adi, LA Ratnawinanda MATEC Web of Conferences 138, 05004, 2017 | 8 | 2017 |