Mohammed Al-Salem
Mohammed Al-Salem
Professor at Mechanical and Industrial Engineering Department, Qatar University
Verified email at qu.edu.qa
Title
Cited by
Cited by
Year
Heuristics for the unrelated parallel machine scheduling problem with setup times
G Rabadi, RJ Moraga, A Al-Salem
Journal of Intelligent Manufacturing 17 (1), 85-97, 2006
2042006
Heuristics for the unrelated parallel machine scheduling problem with setup times
G Rabadi, RJ Moraga, A Al-Salem
Journal of Intelligent Manufacturing 17 (1), 85-97, 2006
2042006
An integrated supply chain problem with environmental considerations
A Diabat, M Al-Salem
International Journal of Production Economics 164, 330-338, 2015
902015
Greedy algorithms and metaheuristics for a multiple runway combined arrival-departure aircraft sequencing problem
G Hancerliogullari, G Rabadi, AH Al-Salem, M Kharbeche
Journal of Air Transport Management 32, 39-48, 2013
872013
A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with set...
G Rabadi, M Helal
712006
A closed-loop supply chain management problem: Reformulation and piecewise linearization
M Al-Salem, A Diabat, D Dalalah, M Alrefaei
Journal of Manufacturing Systems 40, 1-8, 2016
532016
Scheduling to minimize makespan on unrelated parallel machines with sequence dependent setup times
A Al-Salem
Engineering Journal of the University of Qatar 17 (1), 177-187, 2004
532004
Runway capacity management–an empirical study with application to Doha International Airport
F Farhadi, A Ghoniem, M Al-Salem
Transportation Research Part E: Logistics and Transportation Review 68, 53-63, 2014
492014
A heuristic to minimize makespan in proportional parallel flow shops
A Al-Salem
International Journal of Computing & Information Sciences 2 (2), 98, 2004
252004
Minimizing the total completion time in a two-machine flowshop problem with time delays
MK Msakni, W Khallouli, M Al-Salem, T Ladhari
Engineering Optimization 48 (7), 1164-1181, 2016
212016
Pedestrians' crossing behavior at marked crosswalks on channelized right-turn lanes at intersections
D Muley, M Kharbeche, W Alhajyaseen, M Al-Salem
Procedia computer science 109, 233-240, 2017
172017
Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level
MK Msakni, A Diabat, G Rabadi, M Al-Salem, M Kotachi
Computers & Operations Research 99, 218-233, 2018
142018
ISO 9000: 2000 quality management standard: experience in the state of Qatar
K Al-Khalifa, TA Mohamed, A Al-Salem
International Journal of Productivity and Quality Management 3 (4), 457-471, 2008
132008
ISO 9000: 2000 quality management standard: experience in the state of Qatar
K Al-Khalifa, TA Mohamed, A Al-Salem
International Journal of Productivity and Quality Management 3 (4), 457-471, 2008
132008
Heuristics, metaheuristics and approximate methods in planning and scheduling
G Rabadi
Springer, 2016
122016
Multiple-runway aircraft sequencing problems using mixed-integer programming
A Al-Salem, F Farhadi, M Kharbeche, A Ghoniem
IIE Annual Conference. Proceedings, 1, 2012
122012
Pedestrians’ speed analysis at signalized crosswalks
D Muley, W Alhajyaseen, M Kharbeche, M Al-Salem
Procedia computer science 130, 567-574, 2018
112018
On the optimal computing budget allocation problem for large scale simulation optimization
M Al-Salem, M Almomani, M Alrefaei, A Diabat
Simulation Modelling Practice and Theory 71, 149-159, 2017
112017
Prescriptive analytics for FIFA World Cup lodging capacity planning
A Ghoniem, AI Ali, M Al-Salem, W Khallouli
Journal of the Operational Research Society 68 (10), 1183-1194, 2017
72017
An integrated quay crane assignment and scheduling problem using branch-and-price
MK Msakni, M Al-Salem, A Diabat, G Rabadi, M Kotachi
2016 International conference on computational science and computational …, 2016
72016
The system can't perform the operation now. Try again later.
Articles 1–20