Follow
Frank W. Ciarallo
Title
Cited by
Cited by
Year
A survey of agent-based modeling practices (January 1998 to July 2008)
B Heath, R Hill, F Ciarallo
Journal of Artificial Societies and Social Simulation 12 (4), 9, 2009
5202009
A periodic review, production planning model with uncertain capacity and uncertain demand—optimality of extended myopic policies
FW Ciarallo, R Akella, TE Morton
Management science 40 (3), 320-332, 1994
4831994
Helper-objective optimization strategies for the job-shop scheduling problem
DF Lochtefeld, FW Ciarallo
Applied Soft Computing 11 (6), 4161-4174, 2011
792011
An empirical evaluation of holonic and fractal layouts
RG Askin, FW Ciarallo, NH Lundgren
International Journal of Production Research 37 (5), 961-978, 1999
631999
Error analysis and planning accuracy for dimensional measurement in active vision inspection
CC Yang, MM Marefat, FW Ciarallo
IEEE Transactions on Robotics and Automation 14 (3), 476-487, 1998
601998
An agent-based data collection architecture for distributed simulations
Y Xu, S Sen, FW Ciarallo
International Journal of Modelling and Simulation 24 (2), 55-64, 2004
402004
An agent-based modeling approach to analyze the impact of warehouse congestion on cost and performance
BL Heath, FW Ciarallo, RR Hill
The International Journal of Advanced Manufacturing Technology 67, 563-574, 2013
392013
Deterministic helper-objective sequences applied to job-shop scheduling
DF Lochtefeld, FW Ciarallo
Proceedings of the 12th annual conference on Genetic and evolutionary …, 2010
372010
Reliability and operations: Keys to lumpy aircraft spare parts demands
AF Lowas III, FW Ciarallo
Journal of Air Transport Management 50, 30-40, 2016
362016
Multiobjectivization via helper-objectives with the tunable objectives problem
DF Lochtefeld, FW Ciarallo
IEEE Transactions on Evolutionary Computation 16 (3), 373-390, 2011
362011
A material flow based evaluation of layout alternatives for agile manufacturing
RG Askin, NH Lundgren, F Ciarallo
Progress in material handling research, 71-90, 1997
331997
Optimized sensor placement for active visual inspection
CC Yang, FW Ciarallo
Journal of Robotic Systems 18 (1), 1-15, 2001
322001
A robust approach for sensor placement in automated vision dimensional inspection
X Gu, MM Marefat, FW Ciarallo
Proceedings 1999 IEEE International Conference on Robotics and Automation …, 1999
241999
Integrated simulation combining process-driven and event-driven models
VS Kesaraju, FW Ciarallo
Journal of Simulation 6 (1), 9-20, 2012
202012
Building the mobility aircraft availability forecasting (MAAF) simulation model and decision support system
FW Ciarallo, RR Hill, S Mahadevan, V Chopra, PJ Vincent, CS Allen
The Journal of Defense Modeling and Simulation 2 (2), 57-69, 2005
192005
RHODES-ITMS-MILOS: Ramp metering system test
FW Ciarallo, P Mirchandani, A Center
182002
Multi-objectivization via decomposition: An analysis of helper-objectives and complete decomposition
DF Lochtefeld, FW Ciarallo
European Journal of Operational Research 243 (2), 395-404, 2015
172015
Interval constraint networks for tolerance analysis and synthesis
CC Yang, MM Marefat, FW Ciarallo
AI EDAM 14 (4), 271-287, 2000
172000
Validation in the agent-based modelling paradigm: problems and a solution
BL Heath, FW Ciarallo, RR Hill
International Journal of Simulation and Process Modelling 7 (4), 229-239, 2012
162012
Supply Performance in Multi‐Echelon Inventory Systems with Intermediate Product Demand: A Perspective on Allocation
S Niranjan, FW Ciarallo
Decision Sciences 42 (3), 575-617, 2011
162011
The system can't perform the operation now. Try again later.
Articles 1–20