Follow
Neetu Yadav
Neetu Yadav
Assistant Professor
Verified email at snpitrc.ac.in
Title
Cited by
Cited by
Year
Buffer Based CCPM Scheduling:A Modern Approach for Indian Constraints
MPN Yadav
ICRISET2017. International Conference on Re- search and Innovations in …, 2017
7*2017
Assement of resilient safety culture for Surat city
V Trivedi, MNB Yadav
Int. J. Anal. Exp. Model Anal 12, 503-509, 2020
32020
Application of recycled soil and sand in brick production over conventional clay Brick: A sustainable alternative
M Desai, N Yadav, N Desai
Materials Today: Proceedings 77, 879-886, 2023
22023
Pervious concrete: solution for low cost construction
NB Yadav, JA Shah, RA Shah
Int. J. Innov. Sci. Modern Eng.(IJISME) 1 (10), 38-41, 2013
22013
Increasing the potential application of Microsoft project and Primavera P6 for project management: A comparative analysis of the residential project
NV Desai, NB Yadav, NN Malaviya
Materials Today: Proceedings 77, 794-804, 2023
12023
MS project a better alternative for project resource management: A case of Surat city
NV Desai, NB Yadav, A Gupta
AIP Conference Proceedings 2855 (1), 2023
2023
Performance measurement of residential project by the application of S-curve in EVA method
NN Malaviya, NB Yadav, A Gupta
AIP Conference Proceedings 2855 (1), 2023
2023
Application of Primavera P6 for Monitoring and Updating Construction Project Performance.
AR Gupta, NN Malaviya, NB Yadav, SR Bombaywala
Turkish Online Journal of Qualitative Inquiry 12 (9), 2021
2021
ASSESSMENT OF CONTRACTORS’PERFORMACE FAILURE BY IMPORTANCE INDEX
MV kumar Patel, APN Yadav, APV Pathak
Development 3 (5), 2016
2016
SAFETY PERFORMANCE ANALYSIS FOR ONGOING CONSTRUCTION PROJECTS: A CASE STUDY FOR SURAT CITY
MJK Patel, APN Yadav, N Sharma
Development 3 (5), 2016
2016
DURABILITY OF PERVIOUS CONCRETE FOR SUSTAINABLE APPLICATION
NB Yadav, JA Shah, RA Shah, KA Khatri
VALUE ENGINEERING CONCEPT FOR BUILDING CONSTRUCTION
MPS Mistri, MHA Rathod, MVB Pathak
EARNED VALUE FEASIBILITY ANALYSIS FOR SOUTH GUJARAT REGION TO ENHANCE PROJECT PERFORMANCE
MD Joshi, MVB Pathak, MNB Yadav
STUDY OF ALTERNATIVE DISPUTE RESOLUTION IN CONSTRUCTION FIRMS
V Patel, MN Yadav
A REVIEW: RELATIONAL CONTRACTING PHILOSOPHY FOR INDIAN CONSTRUCTION INDUSTRY
AI Patel, ND Sharma, B Neetu
FACTORS INFLUENCE FOR CONTRACTOR’S FAILURE IN RESIDENTIAL CONSTRUCTION PROJECT: A CASE OF 51 BUNGLOWS PROJECT IN BARDOLI CITY
MV kumar Patel, APN Yadav, APV Pathak
IDENTIFY QUALITY ISSUES IN CONSTRUCTION PROJECTS: A REVIEW
HJ Modi, MVB Pathak, MNB Yadav
The system can't perform the operation now. Try again later.
Articles 1–17